Cockle Bay Wharf mixed use development
A 43 storey tower and land bridge at Cockle Bay Wharf, Sydney
Where it is in the process
Approved on 10 Dec 2025
What it proposes
AI summary. Written from this project's page and its SSD-9978934 Development Consent and SSD-9978934 and SSD-7684 MOD 1 Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 43 storey tower and land bridge at Cockle Bay Wharf, Sydney
The project is a 43-storey tower for retail and office uses at 241-249 Wheat Road, Sydney, in the City of Sydney area, with a land bridge over the Western Distributor, open space and pedestrian links. The department puts the estimated development cost at $891.53 million. The consent caps floor area at 89,000 m², made up of 75,000 m² of office and 14,000 m² of retail. A linked modification changes the approved building envelope.
The application was exhibited from 10 Nov 2021 to 7 Dec 2021 and drew 14 submissions: 7 objecting, 3 supporting and 4 commenting. The proponent responded and amended the design. The department's assessment report of December 2025 recommended approval, and its Executive Director, as the Minister's delegate, approved it on 10 Dec 2025 with conditions. Next, the proponent must meet those conditions, including detailed design approvals, before construction.
- Estimated development cost
- $891.5MSSD-9978934 and SSD-7684 MOD 1 Assessment Report
- Tower height
- 43 storeysSSD-9978934 Development Consent
- Maximum gross floor area
- 89,000 m²SSD-9978934 Development Consent
- Office floor area
- 75,000 m²SSD-9978934 Development Consent
- Retail floor area
- 14,000 m²SSD-9978934 Development Consent
- Construction jobs
- 2,265 jobsSSD-9978934 and SSD-7684 MOD 1 Assessment Report
- Operational jobs
- 7,200 jobsSSD-9978934 and SSD-7684 MOD 1 Assessment Report
- Site area
- 2.2 haSSD-9978934 and SSD-7684 MOD 1 Assessment Report
The department's description
Construction and use of a 43 storey mixed-use development and land bridge across part of the Western Distributor between Darling Harbour and Darling Park
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
14 submissions: 10 from the public, 3 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
237 documents in 9 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
EIS73
- AA_Arborist Report
- A_Architectural Design Statement 1
- A_Architectural Design Statement 10
- A_Architectural Design Statement 11
- A_Architectural Design Statement 12
- A_Architectural Design Statement 2
- A_Architectural Design Statement 3
- A_Architectural Design Statement 4
- A_Architectural Design Statement 5
- A_Architectural Design Statement 6
- A_Architectural Design Statement 7
- A_Architectural Design Statement 8
- A_Architectural Design Statement 9
- A_Further Shadow Plans_
- Appendix C_Landscape Drawings_Part1
- Appendix C_Landscape Drawings_Part2
- Appendix C_Landscape Drawings_Part3
- Appendix C_Landscape Drawings_Part4
- Appendix C_Landscape Drawings_Part5
- Application_20211015074215
- BB_Social Impact Assessment
- B_Architectural Drawings
- CC_Stormwater and Flood Management Report
- CIV Letter
- Cockle Bay Park - Environmental Impact Statement
- DD_Landbridge Structural Report_
- D_Demolition Plans
- E - CASA Crane TC4 Approval
- E - CASA Crane TC5 Approval
- EE - Survey
- E_Aeronautical Impact Assessment
- Environmental Impact Statement
- FF_Traffic Impact Assessment
- F_Accessibility (DDA) Report
- GG_Cyclist Movement
- G_Building Code of Australia Report
- HH_Comms Infrastructure
- HH_Electrical Utility Services Infrastructure Asse
- HH_Utility Services Infrastructure Report
- H_BDAR Waiver Request
- H_BDAR Waiver Request_ (1)
- H_BDAR Waiver SSD- 9978934_
- II_Visual and View Impact Analysis
- I_Construction Management Plan
- I_Construction Ped and Traffic MP
- JJ_Operational & Construction WMP
- J_Consultation Report
- KK_Western Distributor Impact Assessment_Part1
- KK_Western Distributor Impact Assessment_Part2
- KK_Western Distributor Impact Assessment_Part3
- KK_Western Distributor Impact Assessment_Part4
- KK_Western Distributor Impact Assessment_Part5
- K_Contamination Investigation
- LL_Maritime Archeaology Statement of Heritage Impa
- L_CPTED
- MM_ACHAR
- M_Design Excellence Report
- NN_Non Aboriginal Archaeology
- N_Design Integrity Panel Summary Letter
- OO_SEARS Conditions
- O_Environmentally Sustainable Design
- PP_SEPP 64 Assessment
- P_Event Management Plan
- Q_Fire Engineering SSDA Statement
- R_Geotechnical Investigation
- S Heritage Assessment Report
- T Heritage Interpretation
- U_Compliance with Approved Concept Proposal
- V_Noise & Vibration Impact Assessment
- W - Environmental Wind Assessment
- X_Public Art Strategy
- Y_Wayfinding Strategy
- Z_Reflectivity Report
Submissions1
Response to Submissions33
- 00 Submissions Report - CBP Stage 2_211222
- 01 A - Architectural Design Report_Part1 211222
- 02 A - Architectural Design Report_Part2 211222
- 03 A - Architectural Design Report - Appendix 1_1 211222
- 04 A - Architectural Design Report - Appendix 1_2 211222
- 05 A - Architectural Design Report - Appendix 1_3 211222
- 06 A - Architectural Design Report - Appendix 2 211222
- 07 A - Architectural Design Report - Appendix 2.1 211222
- 08 A - Architectural Design Report - Appendix 3 211222
- 09 B - Design Excellence Report 211222
- 10 C - GANSW Endorsed DIP Terms of Reference 211222
- 11 D - Site Capacity and Pedestrian Accessibility 211222
- 12 E - Pedestrian Precinct Movement and Catchments 211222
- 13 F - Updated Visual Impact Assessment 211222
- 14 G - Pyrmont Bridge Connection Options Analysis 211222
- 15 H - Pedestrian Wind Statement 211222
- 16 I - Landscape Design Response 211222
- 17 J - Preliminary Remediation Action Plan 211222
- 18 K - Noise and Vibration Impact Assessment 211222
- 19 L - Heritage Response 211222
- 20 M - Review of Titles & Easements 211222
- 21 N - Western Distributor Column Clearance_Part1 211222
- 22 N - Western Distributor Column Clearance_Part2 211222
- 23 O - Precinct Cycling Study 211222
- 24 P - Revised Non-Aboriginal Archaeological Assessment
- 25 Q - Revised Marine Archaeology SOHI
- 26 R - Revised ACHAR (Redacted)
- 27 S - Preliminary Dewatering Management Plan 211222
- 28 T - Traffic Response 211222
- 29 U - Market Street Footbridge Structural Design 211222
- 30 V - Wheat Road and Public Domain Alignment Plan 211222
- 31 W - Ribbon Porte Cochere Swept Paths 211222
- 32 X - Site Line Drawings 211222
Agency Advice50
- Attachment A - Architectural Drawings
- Attachment B - Pyrmont Bridge Capacity Technical Note
- AusGrid - RtS Response
- CASA - EIS Response
- City of Sydney - EIS Response
- Council - Lift design response - Feb 2024
- Council - RRTS Response - July 2023
- Council - RtS Response
- Council advice on Amendment Report - Sept 2024
- DPE Water - RtS Response
- DPIE Water - EIS Response
- EES - EIS Response
- EHG - RFI Response - Jan 2023
- EHG - RtS Response
- EPA - EIS Response
- EPA - RFI Response - Aug 2023
- EPA RFI Response - Att 1
- EPA response to Amendment Report - Sept 2024
- FRNSW Oct 2024
- FRNSW, EPA and Safe Work EIS comments
- HNSW (ACH) - RtS Response
- HNSW - ARD Comments 28 May 2024
- HNSW - EIS Response
- HNSW - RtS Response
- HNSW ACH - RFI Response - July 2023
- HNSW Approvals Committee Response
- HNSW Comment letter - Aug 2023
- HNSW EH - Dec 2024 ARDEM Comments
- HNSW Oct 2024 Comments
- HNSW advice on Amendment Report - Sept 2024
- HNSW(ACH) - EIS Response
- Heriatge NSW - ACH - Additional Review - RTS (SSD-9978934)
- NSW Police - Sydney City PAC - EIS Response
- NSW SES - EIS Response
- NSW SES RFI Response
- PMNSW - RFI Response Aug - 2023
- PMNSW - RtS Response
- RMS (MARITIME) - EIS Response
- RMS (Maritime) - RtS Response
- Sydney Airport - EIS Response
- Sydney Water - RtS Response
- Sydney Water RFI Response
- Sydney Water RFI Response Att 3
- TAB A 20230728 TfNSW Response SYD20_01175_11
- TAB B 20230214 TfNSW Response SYD20_01175_07
- TAB B 20230214 TfNSW Response SYD20_01175_07
- TfNSW - EIS Response
- TfNSW - RFI Response - Aug 2023
- TfNSW - RFI Response - Jul 2023
- TfNSW - RtS Response
Additional Information59
- A_Further Shadow Plans
- Appendix A - Detailed Response Table
- Appendix A - Detailed Response Table
- Appendix B - Architectural Drawings
- Appendix B - Response Package - Tianlong Submission
- Appendix C - Response Package - Fire Rescue NSW Submission
- Appendix C - Supplementary Design Report
- Appendix D - Pyrmont Bridge Response
- Appendix D - Response Package - Pyrmont Bridge Matter
- Appendix E - Loading and Traffic Response
- Appendix E - Revised Architectural Drawings
- Appendix F - Architectural Design Responses
- Appendix F - Wind Memo
- Appendix G - DIP #6 + #7 Preso and Minutes
- Appendix G - Waste Response
- Appendix H - Accessibility Responses
- Appendix H - Landscape Response Pack
- Appendix I - Landscape Diagrams
- Appendix I - Revised Waste Management Plan
- Appendix J - Maritime Archaeology SOHI
- Appendix J - Wind Memo
- Appendix K - Heritage Responses
- Appendix K - Non Aboriginal Archaeological Heritage
- Appendix L - Heritage Response
- Appendix L - Integrated ARDEM_V5
- Appendix M - Connecting with Country Response
- Appendix M - Safe Intersection Site Distance Drawings
- Appendix N - Resubmitted Stormwater and Flood Report
- Appendix N - Structural Letter - Pyrmont Bridge
- Appendix O - Interim Audit Advice
- Appendix O - Summmary of Consultation with Disability Group
- Appendix P - Wheat Road Alignment
- Applicant Response to DGV Peer Review
- Attachment 1 - Landbridge Risk Assessment Report
- Attachment 2 - Arriscar Report_Part1
- Attachment 3 - Landbridge Voids Concept Design
- August 2023 Appendix A - Updated Turning paths
- August 2023 Appendix B - Intersection Site Distance
- August 2023 Appendix C - Wheat Road Alignment
- August 2023 Greaton RFI Response
- CBP Planning Letter - June 2024
- CBP-HEN-DRW-A-DA-2050_Issue_8
- CBP-HEN-DRW-A-DA-2051_Issue 7
- CBP-HEN-DRW-A-DA-2052_Issue_9
- CBP-HEN-DRW-A-DA-2053_Issue_9
- CBP-HEN-DRW-A-DA-2550_Issue 7
- CBP-HEN-DRW-A-DA-2551_Issue 7
- CBP-HEN-DRW-A-DA-2553_Issue 8
- DD_Landbridge Structural Report
- DGV Safety Review Report - Applicant Update
- GHD DG Peer Review Report
- GHD Peer Review Addendum
- Greaton App A - Revised Wheat Road Alignment Plan
- Greaton App B - Access Technical Note
- Greaton Letter - May 2024
- H_BDAR Waiver Request
- H_BDAR Waiver SSD- 9978934
- July 2023 - Submissions and Amendment Report
- June 2024 - Submissions and Amendments Report
Determination17
- SSD-9978934 Development Consent
- SSD-9978934 Notice of Decision
- SSD-9978934 Stamped Arch Plans Part 1 of 4
- SSD-9978934 Stamped Arch Plans Part 2 of 4
- SSD-9978934 Stamped Arch Plans Part 3 of 4
- SSD-9978934 Stamped Arch Plans Part 4 of 4
- SSD-9978934 Stamped Landscape Plans Part 1 of 9
- SSD-9978934 Stamped Landscape Plans Part 2 of 9
- SSD-9978934 Stamped Landscape Plans Part 3 of 9
- SSD-9978934 Stamped Landscape Plans Part 4 of 9
- SSD-9978934 Stamped Landscape Plans Part 5 of 9
- SSD-9978934 Stamped Landscape Plans Part 6 of 9
- SSD-9978934 Stamped Landscape Plans Part 7 of 9
- SSD-9978934 Stamped Landscape Plans Part 8 of 9
- SSD-9978934 Stamped Landscape Plans Part 9 of 9
- SSD-9978934 Stamped Stormwater Plans
- SSD-9978934 and SSD-7684 MOD 1 Assessment Report
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.