CMRI Gene Technologies Building
A research building at 214 Hawkesbury Road, Westmead
Where it is in the process
Approved on 24 Jul 2026
What it proposes
AI summary. Written from this project's page and its Assessment Report and Development Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A research building at 214 Hawkesbury Road, Westmead
The Children's Medical Research Institute proposed to redevelop its site at 214 Hawkesbury Road, Westmead, in the City of Parramatta, within the Westmead Health Precinct. The project demolishes the original research building and constructs eight and 10 storey buildings with a basement, pedestrian links, car parking, vehicle access and landscaping. The site is 4,711 m². The department gives a capital investment value of $247,677,000 and 540 additional operational jobs, and 56 on-site car parking spaces are provided.
The environmental impact statement (EIS) was exhibited from 7 May 2025 to 3 June 2025 and drew 4 submissions: 2 in support and 2 comments. The department's assessment recommended approval. A delegate of the Minister for Planning and Public Spaces, a department director, approved the project with conditions on 24 Jul 2026. Next, the applicant must meet the consent's conditions before and during construction.
- Capital investment
- $247.7MAssessment Report
- Additional operational jobs
- 540 jobsAssessment Report
- Site area
- 4,711 m²Assessment Report
- On-site car parking spaces
- 56 car spacesAssessment Report
The department's description
Redevelopment of the Children's Medical Research Institute, including: demolition works, tree removal, construction of 8 storey and 10 storey buildings including basement, pedestrian links, car parking, vehicle access, earthworks and landscaping.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
4 submissions: 1 from the public, 2 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
84 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS51
- Appendix A - SEARs Compliance Table
- Appendix AA1 - Geotechnical Assessment
- Appendix AA2 - Geotech Impact Assessment
- Appendix AB - Preliminary Site Investigations
- Appendix AC - RAP
- Appendix AD - Preliminary Hazard Analysis
- Appendix AE1 - Site Audit Currency Memo
- Appendix AE2 - Site Auditor's Letter
- Appendix AF1 - Pre-Demolition
- Appendix AF2 - Hazardous Building Materials Survey Advice
- Appendix AG - BCA Assessment
- Appendix AH - Accessibility Assesment
- Appendix AI1 - Rail Corridor Engineering Statement
- Appendix AI2 - Statement of Currency
- Appendix AJ - Electrolysis Report
- Appendix AK - Estimated Development Cost
- Appendix AL - NABERS Embodied Emissions Materials Form
- Appendix AM - Net Zero Statement
- Appendix AN - Fire safety Compliance Report
- Appendix B - Statutory Compliance Table
- Appendix C - Mitigation Measures
- Appendix D - Engagement Summary
- Appendix E - Site Survey
- Appendix F - Architectural Design Report
- Appendix G - Architectural Plans
- Appendix H - Landscape Report
- Appendix I - Landscape Plans
- Appendix J - Arboricultural Impact Assessment
- Appendix K - BDAR Waiver
- Appendix L - Ecological Sustainable Development
- Appendix M - Pedestrian Wind Assessment
- Appendix N - ACHAR
- Appendix O - ACHAR Currency Statement
- Appendix P1 - Aboriginal Heritage Consultation
- Appendix P2 - Aboriginal Consultation and Design Currency
- Appendix Q - Statement of Heritage Impact
- Appendix R - Aviation Report
- Appendix S - Noise and Vibration Impact Assessment
- Appendix T - Engagement Report
- Appendix U1 - Social Impact Assessment
- Appendix U2 - Social Impact Assessment guideline alignment
- Appendix V - Preliminary CEMP
- Appendix W - Waste Management Plan
- Appendix X - Operational Waste Management Plan
- Appendix Y1 - Transport and Accessibility Impact Assessment
- Appendix Y2 - Green Travel Plan
- Appendix Y3 - Construction Traffic Management Plan
- Appendix Z1 - Civil Report
- Appendix Z2 - Flood Report
- Application_20250328041630
- Environmental Impact Statement
Response to Submissions14
- CMRI Gene Technologies RtS report
- RTS Appendix A - Detailed RTS
- RTS Appendix B - Mitigation Measures
- RTS Appendix C - Amended Architecture Plans
- RTS Appendix D - Amended Landscape Plans
- RTS Appendix E - Amended Flood Report
- RTS Appendix F - Flooding Response
- RTS Appendix G - Traffic Response
- RTS Appendix H - Preliminary Car Park MP
- RTS Appendix I - Shadow Analysis
- RTS Appendix J - Pavement Plan
- RTS Appendix K - Flood Statement
- RTS Appendix L - Power Supply Assessment
- Request RtS Letter
Agency Advice6
Additional Information5
What's near it
Where it is
- Suburb
- Westmead
- Council area
- Parramatta
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.