Central Park - Block 3A
A 60-room boutique hotel at Central Park, Chippendale
Where it is in the process
Approved With Conditions on 5 Apr 2013
What it proposes
AI summary. Written from this project's page and its 2_Director General's Assessment Report.pdf and Project Approval.pdf on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 60-room boutique hotel at Central Park, Chippendale
The project is a boutique hotel at Block 3A of Central Park, 26 Broadway, Chippendale, on the former Carlton United Brewery site in the City of Sydney. It has 60 hotel rooms, a total floor area of 4,595.9 m² and 1,098 m² of food and drink premises, including three restaurants and a lounge. It also has conference facilities, a rooftop deck and a pool. It adds one storey to the Clare Hotel and two storeys to the Administration Building, joined by a new glazed link. No capital investment is stated.
The environmental assessment was dated November 2012, and the proponent's response to submissions was dated 5 March 2013. The portal records no submission count. On 5 Apr 2013 the department's Executive Director, as the Minister's delegate, approved the project with conditions. Next, the proponent must meet those conditions before and during construction, including heritage conservation works and a construction environmental management plan.
- Hotel rooms
- 60 roomsProject Approval.pdf
- Total gross floor area
- 4,595.9 m²Project Approval.pdf
- Food and drink premises
- 1,098 m²Project Approval.pdf
The portal gives no description.
Modifications
6 changes to the project after its decision, each assessed as a case of its own, newest first.
Mod 6MP11_0089-Mod-6
Its 13 documents
13 documents in 4 folders, each on the NSW Planning Portal
Request for DGRS7
Submissions1
Recommendation2
Determination3
Mod 5MP11_0089-Mod-5
Its 7 documents
7 documents in 3 folders, each on the NSW Planning Portal
Application3
Recommendation2
Determination2
Mod 4MP11_0089-Mod-4
Its 11 documents
11 documents in 4 folders, each on the NSW Planning Portal
Application5
Submissions1
Recommendation2
Determination3
Mod 3MP11_0089-Mod-3
Its 28 documents
28 documents in 5 folders, each on the NSW Planning Portal
Application10
Submissions6
Response to Submissions6
Recommendation2
Determination4
Mod 2MP11_0089-Mod-2
Its 11 documents
11 documents in 4 folders, each on the NSW Planning Portal
Application6
Submissions1
Recommendation2
Determination2
Mod 1MP11_0089-Mod-1
Its 11 documents
11 documents in 4 folders, each on the NSW Planning Portal
Application6
Submissions1
Recommendation2
Determination2
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
58 documents in 6 folders, each on the NSW Planning Portal
Application5
EA36
- 12409_Appendix A_Architectural Drawings, Photomontag...
- 12409_Appendix A_Architectural Drawings, Photomontag...
- 12409_Appendix A_Architectural Drawings, Photomontag...
- 12409_Appendix B_Director General’s Requirements_211...
- 12409_Appendix C_Survey Plan_21112012.pdf
- 12409_Appendix D_GFA Plans and GFA Certificate_21112...
- 12409_Appendix E_Heritage Impact Statement_21112012 ...
- 12409_Appendix E_Heritage Impact Statement_21112012 ...
- 12409_Appendix E_Heritage Impact Statement_21112012 ...
- 12409_Appendix E_Heritage Impact Statement_21112012 ...
- 12409_Appendix E_Heritage Impact Statement_21112012 ...
- 12409_Appendix F_Specific Element Conservation Manag...
- 12409_Appendix F_Specific Element Conservation Manag...
- 12409_Appendix F_Specific Element Conservation Manag...
- 12409_Appendix F_Specific Element Conservation Manag...
- 12409_Appendix F_Specific Element Conservation Manag...
- 12409_Appendix F_Specific Element Conservation Manag...
- 12409_Appendix G_Operational Management Plan_2111201...
- 12409_Appendix H_Safety Management Strategy and Safe...
- 12409_Appendix I_Building Services_21112012.pdf
- 12409_Appendix J_Waste Management Statement_21112012...
- 12409_Appendix K_Traffic Assessment Report_21112012.pdf
- 12409_Appendix L_Construction Traffic Management Pla...
- 12409_Appendix M_ESD Guide_21112012.pdf
- 12409_Appendix N_PA Stormwater Report_21112012 part ...
- 12409_Appendix N_PA Stormwater Report_21112012 part ...
- 12409_Appendix N_PA Stormwater Report_21112012 part ...
- 12409_Appendix N_PA Stormwater Report_21112012 part ...
- 12409_Appendix O_Geotechnical Investigation_21112012...
- 12409_Appendix P_Structural Design Certificate_21112...
- 12409_Appendix Q_Preliminary Construction Management...
- 12409_Appendix R_Acoustic Report_21112012.pdf
- 12409_Appendix S_Access Report_21112012.pdf
- 12409_Appendix T_BCA Assessment Report_21112012.pdf
- 12409_Appendix U_Site Audit Report and Site Audit St...
- 12409_Block 3A_FINAL EAR_28Nov2012.pdf
Submissions6
Response to Submissions8
- Appendix A_Response to Submissions Table.pdf
- Appendix B1_Revised Archtiectural Drawings_lowres.pdf
- Appendix B2_Photomontages_lowres.pdf
- Appendix C_Acoustic Statement.pdf
- Appendix D_Traffic and Parking Statement.pdf
- Director General's Assessment Report-1.pdf
- Director General's Assessment Report.pdf
- Preferred Project Report.pdf
What's near it
Where it is
- Suburb
- Chippendale
- Council area
- Sydney
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.