Burrah Park
Burrah Park industrial estate, Elizabeth Drive, Badgerys Creek
Where it is in the process
Approved on 29 Jun 2026
What it proposes
AI summary. Written from this project's page and its SSD-70316465 Assessment Report and SSD-70316465 Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Burrah Park industrial estate, Elizabeth Drive, Badgerys Creek
Burrah Park is a concept proposal for an industrial estate on a 171.81 ha site at 1953-2109 Elizabeth Drive, Badgerys Creek, in the Penrith area, opposite Western Sydney Airport. It allows up to 631,800 m² of floor space for warehousing, light industry and commercial uses, with a neighbourhood centre. Stage 1 covers earthworks, roads, stormwater works and three warehouses. The concept has an estimated cost of $989,338,207 and 3,237 operational jobs. Stage 1 is estimated at $366 million.
The environmental impact statement was exhibited from 15 Nov 2024 to 12 Dec 2024. It drew 3 submissions, all comments, from an organisation and public authorities. The proponent responded and gave more information. The department recommended approval. A department director, as the Minister's delegate, approved it on 29 Jun 2026 with conditions. Later stages need their own development applications, and the proponent must meet the conditions.
- Concept proposal: estimated development cost
- $989.3MSSD-70316465 Assessment Report
- Stage 1: estimated development cost
- $366MSSD-70316465 Assessment Report
- Maximum gross floor area
- 631,800 m²SSD-70316465 Assessment Report
- Site area
- 171.81 haSSD-70316465 Assessment Report
- Operational jobs
- 3,237 jobsSSD-70316465 Assessment Report
The department's description
Concept proposal for an industrial warehouse and logistics estate with a Stage 1 development including bulk earthworks, road access and internal road construction, civil infrastructure and utilities, and construction and operation of 3 warehouses.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
3 submissions: 1 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
Burrah Park - Burrah Park MOD 1 - Dam Dewatering TimingSSD-70316465-Mod-1
Administrative modification to permit dam dewatering prior to implementation of the broader dam decommissioning strategy
Its 5 documents
5 documents in 3 folders, each on the NSW Planning Portal
Modification Application2
Determination2
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
231 documents in 10 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs11
- Appendix A - EDC - Stage 1 -Burra Park
- Appendix A - EDC Concept - Burra Park
- Appendix B - Concept Plan - Burra Park
- Appendix B - Concept Superlot Plan - Burra Park
- Appendix B - Stage 1 Plan - Burra Park
- Appendix C - Meeting Minutes - DPHI
- Appendix D - Meeting Minutes - TfNSW
- Appendix E - Meeting Minutes - Sydney Water
- Appendix F - Meeting Minutes - PCC
- Map Pack
- Scoping Report - Burra Park
EIS61
- Appendix A - SEARs Compliance_Table
- Appendix AA - Statement of Heritage Impact
- Appendix AAA - Net Zero Statement
- Appendix B - Architectural Plans
- Appendix BB - Air Quality Impact & Odour Assessment
- Appendix BBB - Agreement to Rate WH1.1
- Appendix C - Statutory Compliance Table
- Appendix CC - Waste Management Plan
- Appendix CCC - Agreement to Rate WH1.2
- Appendix D - Engagement Compliance Table
- Appendix DD - Biodiversity Impact Assessment Report
- Appendix DDD - Agreement to Rate WH3.1
- Appendix E - Proposed Mitigation Measures
- Appendix EE - Biodiversity Management Plan
- Appendix EEE - Biodiversity Development Assessment Report
- Appendix F - Clause 4.39 Variation Request
- Appendix FF - Wildlife Hazard Assessment Report
- Appendix FFF - SDRP Response Table
- Appendix G - Estimated Development Cost
- Appendix GG - Flora and Fauna Management Plan
- Appendix GGG - Wildlife Hazard Management Plan
- Appendix H - Infrastructure Staging & Delivery Plan
- Appendix HH - Veggetation Management Plan
- Appendix I - Site Survey
- Appendix II - Weed Eradication Management Plan
- Appendix J - Engagement Outcomes Report
- Appendix JJ - Surface & Groundwater Impact Assessment
- Appendix K - Connection With Country
- Appendix KK - Social Impact Assessment
- Appendix L - Urban Design Report & Design Guidelines
- Appendix LL - Ecologically Sustainable Development Report
- Appendix M - Design Excellence Strategy
- Appendix MM - Smart Cities Report
- Appendix N - Visual Impact Assessment
- Appendix NN - Accessibility Report
- Appendix O - Landscape Plans & Report
- Appendix OO - Fire Safety Strategy Report
- Appendix P - Transport & Accessibility Impact Assessment
- Appendix PP - BCA Report
- Appendix Q - Civil Infrastructure Report
- Appendix QQ - Lighting & Impact Assessment
- Appendix R - Flood Impact Assessment
- Appendix RR - Economic Impact Assessment
- Appendix S - Noise & Vibration Impact Assessment
- Appendix SS - Riparian Impact Assessment
- Appendix T - Detailed Site Investigation
- Appendix TT - Salinity Management Plan
- Appendix U - Geotechnical Report
- Appendix UU - CPTED Report
- Appendix V - Hazardous Building Material
- Appendix VV - Dam Dewatering Plan
- Appendix W - Hazard & Risk Assessment
- Appendix WW - Civil Infrastructure Stage 1 Plans
- Appendix X - Bushfire Report
- Appendix XX - Civil Infrastructure Estate Plans
- Appendix Y - Aviation Safeguarding Assessment
- Appendix YY - Aboriginal Cultural Heritage Assessment V2
- Appendix Z - Aboriginal Cultural Heritage Assessment V1
- Appendix ZZ - Embodied Emisions Materials Form
- Application_20241101042400
- SSD-70316465_Burrah_Park_EIS
Response to Submissions59
- Appendix A - Response to Submissions Table
- Appendix A - Response to Submissions Table v2
- Appendix AA - Clause 4.39 Variation Request
- Appendix B - Updated Architectural Plans
- Appendix BB -_Design Excellence Strategy
- Appendix C - Traffic Modelling Addendum Report
- Appendix CC - Landowner Consultation_Redacted
- Appendix DD - E-mail from TfNSW
- Appendix Di - Updated Civil Report
- Appendix Dii - Updated Civil Drawings (Concept)
- Appendix Diii - Civil Drawings (Stage 1)
- Appendix Diiii - Survey
- Appendix Diiiii - Flow Curve
- Appendix E - Updated Landscape Strategy Report
- Appendix EE - Updated Riparian Assessment
- Appendix Ei - Updated Landscape SSD Plans
- Appendix F - Bushfire Cover Letter
- Appendix FF - Updated Biodiversity Management Plan
- Appendix G - Fill Import Protocol
- Appendix GG - DRM Cover Letter
- Appendix H - Dam Water and Sediment Assessment
- Appendix HH - Updated Urban Design Report
- Appendix I - Remediation Action Plan
- Appendix II - Updated UD Report - SDRP Response Table
- Appendix J - Updated Biodiversity Report
- Appendix JJ - Updated Urban Design Guidelines
- Appendix K - Updated Noise and Vibration Report
- Appendix KK - Wildlife Hazard Assessment
- Appendix L - Access Report
- Appendix LL - NABERS Agreement to Rate WH 1.1
- Appendix M - AvLaw Cover Letter
- Appendix MM - NABERS Agreement to Rate WH 1.2
- Appendix NN - NABERS Agreement to Rate WH 3.1
- Appendix O - Glint and Glare Assessment
- Appendix OO - Flood Assessment Addendum
- Appendix P - Public Art Strategy
- Appendix PP - Excluded Land BDAR
- Appendix Q - Updated Connecting With Country Report
- Appendix QQ - Vegetation Management Plan
- Appendix R - Amended Visual Impact Assessment
- Appendix RR - MNES Assessment
- Appendix S - Updated Net Zero Statement
- Appendix SS - BDAR Data Package
- Appendix T - Sydney Water Consultation
- Appendix TT - BDAR VI Plot Data
- Appendix Ti - Penrith Council Consultation
- Appendix Tii - INSW Consultation
- Appendix Tiii - DPHI_TfNSW_PCC Consultation
- Appendix U - Updated Resilience and Hazard SEPP Report
- Appendix UU - Landowners Consent
- Appendix Vi - Response to Heritage NSW Vol 1 of 2
- Appendix Vii Response to Heritage NSW Vol 2 of 2
- Appendix W - Submission to Sydney Water Draft Scheme Plan
- Appendix X - Civil Construction Staging Plan
- Appendix Y - Groundwater Addendum
- Appendix Z - Flood Report
- Burrah Park - Response to Submissions_Final_v1
- SSD-70316465 DPHI EIS comments 310125
- SSD-70316465 RTS request letter
Agency Advice43
- Additional Info advice - CPHR
- Additional Info advice - CPHR 2
- Additional Info advice - CPHR 3
- Additional Info advice - HNSW
- Additional Info advice - PCC
- Additional Info advice - SWC
- EIS Advice - BCS
- EIS Advice - BDA
- EIS Advice - CASA
- EIS Advice - Crown Lands
- EIS Advice - DCCEEW Water
- EIS Advice - DPIRD Agriculture
- EIS Advice - DPIRD Fisheries
- EIS Advice - FRNSW
- EIS Advice - HNSW ACH
- EIS Advice - Heritage Council
- EIS Advice - Jemena
- EIS Advice - LCC
- EIS Advice - PCC
- EIS Advice - RFS
- EIS Advice - SWC
- EIS Advice - Sydney Metro
- EIS Advice - TfNSW
- EIS Advice - Transgrid
- EIS Advice - WSI
- RTS 2 advice - CPHR
- RTS 2 advice - DCCEEW Water
- RTS 2 advice - HNSW
- RTS 2 advice - PCC
- RTS 2 advice - RFS
- RTS 2 advice - SES
- RTS 2 advice - SWC
- RTS 2 advice - TfNSW
- RTS 2 advice - WSA
- RTS Advice - CPHR
- RTS Advice - DCCEEW Water
- RTS Advice - DPIRD Fisheries
- RTS Advice - HNSW
- RTS Advice - Liverpool Council
- RTS Advice - Penrith Council
- RTS Advice - SWC
- RTS Advice - TfNSW
- RTS Advice - WSI
Additional Information46
- Appendix A_HNSW Response Letter
- Appendix A_RTS 2 Response Table
- Appendix B_Detailed Landscape Drawings
- Appendix B_Updated Architectural Plans
- Appendix C_Infrastructure Location Map
- Appendix C_Updated Landscape Strategy Report
- Appendix D_Parking Response Letter
- Appendix D_Response to Submisisons Traffic
- Appendix E_Neighbourhood Centre Assessment
- Appendix F_ACHAR Addendum
- Appendix F_Letter of Acceptance for VPA LoO
- Appendix G_Civil Response Letter
- Appendix G_Sydney University Letter
- Appendix H_TfNSW M12 Letter
- Appendix H_Updated Civil Engineering Report
- Appendix I_Updated Bushfire Assessment Report
- Appendix I_Updated MUSIC models
- Appendix J_Complete Estate Civil Drawings
- Appendix J_Ecological Response to CPHR
- Appendix K_Complete Stage 2 Civil Drawings
- Appendix K_Glint & Glare Assessment Addendum
- Appendix L_Amended Civil Drawings Only
- Appendix L_Flood Assessment Addendum
- Appendix M_Dedication or Acquisition plan
- Appendix N1_Estate Civil Drawings
- Appendix N2_Stage Civil 1 Drawings
- Appendix O_Civil Report
- Appendix P_Updated Biodiversity Assessment Report
- Appendix Q_Species Polygon Response
- Appendix R_Subdivision Plan
- Appendix S_Detailed Staging Plan
- Appendix T_Updated MNES Assessment
- Appendix U_Updated Riparian Assessment
- Appendix V_Updated Wildlife Hazard Assessment
- Appendix W_Updated Vegetation Management Plan
- Appendix X_Updated Biodiversity Management Report
- Burrah Park RtS 3 - Response Letter
- Excluded Land BDAR v5_17Jun26
- MUSIC Model RTS 2
- RTS 2 Report_Burrah Park SSDA
- SSD-70316465 Agency feedback on RTS
- SSD-70316465 DPHI RTS comments
- SSD-70316465 RFI 100226
- SSD-70316465 RFI 230625
- Staged Subdivision Plan
- Updated Excluded Land BDAR
Management Plans and Strategies2
What's near it
Where it is
- Suburb
- Badgerys Creek
- Council area
- Penrith
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.