Boree Solar Farm
A 250 MW solar farm and battery near Geurie
Where it is in the process
At prepare eis
What it proposes
AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 250 MW solar farm and battery near Geurie
The proponent proposes a solar farm with a capacity of up to 250 MW (direct current) and 200 MW (alternating current), plus a battery that can deliver 200 MW for four hours, or 800 MWh. It would sit on a site of about 1,322 ha, with a development footprint of about 981 ha, north of Geurie in the Dubbo Regional Council area. It would have up to 600,000 solar panels and connect into the existing 132 kV Essential Energy network on the site. No capital investment or job numbers are stated.
The case is at the stage where the proponent prepares its environmental impact statement (EIS). A scoping report was lodged and the Secretary's environmental assessment requirements (SEARs) have been issued, with advice from agencies. No submissions have been made yet. Next, the proponent submits the EIS, which is then exhibited so the public can make submissions. The department then assesses it.
- Solar capacity (DC)
- 250 MWScoping Report
- Battery power capacity
- 200 MWScoping Report
- Battery storage capacity
- 800 MWhScoping Report
- Project site area
- 1,322 haScoping Report
- Development footprint
- 981 haScoping Report
- Solar panels
- 600,000 modulesScoping Report
The department's description
Development of a 250 megawatt solar farm with 200 megawatt / 800 megawatt hour battery energy storage system and associated infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
16 documents in 3 folders, each on the NSW Planning Portal
Request for SEARs1
SEARs1
Agency Advice14
- SEARs Advice - CPHR
- SEARs Advice - Crown Lands
- SEARs Advice - DCCEEW Water
- SEARs Advice - DPIRD Fisheries
- SEARs Advice - DPIRD Resources
- SEARs Advice - Dubbo Regional Council
- SEARs Advice - Essential Energy
- SEARs Advice - FRNSW
- SEARs Advice - HNSW Aboriginal Cultural Heritage
- SEARs Advice - HNSW Environmental Heritage
- SEARs Advice - NSW Resources
- SEARs Advice - NSW Rural Fire Service
- SEARs Advice - SSO
- SEARs Advice - TfNSW
What's near it
Its point is approximate (the register's own, to about a kilometre), and so are these.
Where it is
- Suburb
- Wongarbon
- Council area
- Dubbo Regional
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.