On the map
State significant development

Ben Bullen Wind Farm

A 500 MW wind farm and battery near Ben Bullen, Lithgow

Under way: at prepare eisEnergy: windDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 500 MW wind farm and battery near Ben Bullen, Lithgow

The proponent proposes a wind farm with a generation capacity of up to about 500 MW, about 25 km north-west of Lithgow in the Lithgow City Council area. It would have up to 64 turbines, each up to 252 m high to the blade tip. A battery of 200 MW and 800 MWh is also proposed, connecting to existing transmission lines. The project study area is about 8,887 ha, with a preliminary disturbance footprint of about 416 ha. No capital investment is stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The proponent's scoping report is dated January 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued. No submissions have been made yet. Next, the proponent exhibits the EIS, when the public can make submissions. The department then assesses it, and the Minister or the Independent Planning Commission decides.

Generation capacity
500 MWScoping Report
Wind turbines
64 turbinesScoping Report
Turbine height to blade tip
252 mScoping Report
Battery power capacity
200 MWScoping Report
Battery storage capacity
800 MWhScoping Report
Project study area
8,887 haScoping Report
Disturbance footprint
416 haScoping Report

The department's description

The construction, operation and decommissioning of a wind farm with an estimated capacity of 500 megawatts, up to 64 turbines with a maximum height of 252 metres (to blade tip), a 200MW / 800 MWh BESS, and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.