State significant development

Wallerawang Battery Energy Storage System

Decided: approved on 4 Aug 2022Energy: batteriesRegional scale

Where it is in the process

Approved on 4 Aug 2022

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination4 Aug 2022 (done)
  9. Approved4 Aug 2022

What it proposes

The department's description

Development of a 500 MW / 1,000 MW/h battery energy storage system with associated infrastructure and connection works

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

12 submissions: 7 from the public, 2 from organisations and 3 from public authorities

Object0
Support10
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

2 changes to the project after its decision, each assessed as a case of its own, newest first.

Wallerawang BESS - Modification 2SSD-14540514-Mod-2

Decided: approved on 30 Jun 2026 by the department (director)

Corrections to the Schedule of Lands

Its 5 documents

5 documents in 3 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

MOD 1 - Layout reconfiguration and capacity increaseSSD-14540514-Mod-1

Decided: approved on 25 Mar 2026 by the department (executive director) · 27 submissions

Revised project layout, change the transmission line connection design and increase in battery capacity to 600 MW

Its 68 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.