On the map
Part 4 development

Bayswater No.3 colliery

Bayswater No.3 colliery coal mine, Muswellbrook and Singleton

Decided: decidedMiningNeighbourhood scale

Where it is in the process

At determination

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination (current stage)

What it proposes

AI summary. Written from this project's page on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Bayswater No.3 colliery coal mine, Muswellbrook and Singleton

The case is Bayswater No.3 colliery, a coal mining project in the Muswellbrook Shire and Singleton Shire council areas. The portal gives no street address and no description. No size, capital investment, production figure or job numbers are stated, so how big the mine is or what work it covers is not known.

The portal lists the case at the determination stage, under the reference DA12-09-1994, and records the decision as undetermined by the department's Deputy Secretary. No decision date is given. No public submissions are recorded, and no documents are listed, so no exhibition dates or other stages are known.

The portal gives no description.

Modifications

1 change to the project after its decision, each assessed as a case of its own, newest first.

Mod 1 - Haulage coal along Thomas Mitchell DriveDA12-09-1994-Mod-1

Decided: approved on 17 May 2001 by the Minister

Its 8 documents

8 documents in 1 folder, each on the NSW Planning Portal

Determination8

See the 8 documents on the Planning Portal

Its page on the Planning Portal

What's near it

Its point is approximate (the register's own, to about a kilometre), and so are these.

Where it is

Suburb
Wirraba
Council areas
Muswellbrook, Singleton

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.