Baldon Wind Farm

A wind farm of up to 175 turbines near Moulamein

Decided: approved on 10 Nov 2026Energy: windDistrict scale

Where it is in the process

Approved on 10 Nov 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination10 Nov 2026 (done)
  9. Approved10 Nov 2026

What it proposes

AI summary. Written from this project's page and its Development Consent and Assessment Report - Recommendation to IPC on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A wind farm of up to 175 turbines near Moulamein

The project is a wind farm in the South West Renewable Energy Zone, about 13 km north of Moulamein, mainly in the Murray River Council area and partly in Hay Shire. The department's report describes up to 175 turbines in two stages: 46 in Stage 1 and 129 in Stage 2. It also includes a battery and substations. The consent caps the battery at 200 MW and 400 MWh and the turbines at 300 m tall. The project has up to 400 construction jobs and 35 operation jobs.

The environmental impact statement (EIS) drew 80 submissions: 72 objecting, 2 supporting and 6 commenting. The proponent amended the project and removed five turbines. The department's assessment report went to the Independent Planning Commission without an overall recommendation. The Commission approved the project on 10 Nov 2026, with conditions. Next, the proponent must meet those conditions, including a voluntary planning agreement with the councils, before construction.

Maximum wind turbines approved
175 turbinesDevelopment Consent
Stage 1 turbines
46 turbinesAssessment Report - Recommendation to IPC
Stage 2 turbines
129 turbinesAssessment Report - Recommendation to IPC
Maximum turbine height
300 mDevelopment Consent
Maximum battery power
200 MWDevelopment Consent
Maximum battery storage
400 MWhDevelopment Consent
Construction jobs
400 jobsAssessment Report - Recommendation to IPC
Operation jobs
35 jobsAssessment Report - Recommendation to IPC

The department's description

Construction and operation of a wind farm with up to 180 wind turbines, battery storage and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

80 submissions: 68 from the public, 9 from organisations and 3 from public authorities

Object72
Support2
Comment6

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

100 documents in 10 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs5
SEARs21
EIS16
Response to Submissions14
Agency Advice17
Amendments2
Additional Information17
Recommendation5
Determination2