Abercrombie Wind Farm

Abercrombie Wind Farm: up to 348 turbines near Hay

Under way: at prepare eisEnergy: windDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Abercrombie Wind Farm: up to 348 turbines near Hay

The proponent proposes a wind farm of up to 348 wind turbine generators, with blade tips up to 300 m high and a generating capacity of about 2.5 GW. It would also include up to two battery energy storage systems, each up to 500 MW, and transmission infrastructure. The project area is a landholding of about 93,420 ha near Hay, in the Hay Shire and Edward River council areas. No capital investment is stated.

The proponent lodged a scoping report dated 21 Oct 2024, and government agencies have given advice on what the assessment should cover. The project is now at the stage where the proponent prepares an environmental impact statement (EIS). No public submissions have been made, because no EIS has been exhibited. Next, the EIS is exhibited for public submissions, the proponent responds, and the department assesses it. The Minister or a delegate then decides.

Wind turbines
348 turbinesScoping Report
Generating capacity
2.5 GWScoping Report
Maximum blade tip height
300 mScoping Report
Capacity of each battery system
500 MWScoping Report
Project area
93,420 haScoping Report

The department's description

The project would involve the construction, operation and maintenance and decommissioning of a new wind farm with up to 348 wind turbine generators, associated infrastructure, and battery energy storage systems.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Maude
Council areas
Hay, Edward River

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.