On the map
Part 4 development

Australian Bay Lobster Facility

Decided: decidedAgriculture

Where it is in the process

At determination

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination (current stage)

What it proposes

The department's description

Construction and operation of a commercial Australian Bay Lobster aquaculture facility and associated seawater supply works.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

2 changes to the project after its decision, each assessed as a case of its own, newest first.

Australian Bay Lobster - MOD 1 - Site Levels and Borrow PitDA282-11-2004-i-Mod-1

Decided: decided

The proposed modification includes changes to the site levels and increasing the capacity of the borrow pit.

Its page on the Planning Portal

Australian Bay Lobster - MOD 2 - Staging and Seawater SupplyDA282-11-2004-i-Mod-2

Decided: approved on 23 Sep 2013 by Dir(SSS)

A change letting Stage 1 of the Chinderah lobster farm part-operate on Tugun desalination seawater, approved by the department on 23 Sep 2013.

The department's description

.

Its 9 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.