ATP Locomotive Workshop (Bays 5 - 15)
Where it is in the process
Approved on 22 Feb 2019
What it proposes
The portal gives no description.
Submissions
What the public, organisations and public authorities said, counted by where they stood.
54 submissions: 46 from the public and 8 from organisations
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
12 changes to the project after its decision, each assessed as a case of its own, newest first.
SSD-8449 MOD 8 - Locomotive Workshop (Bays 5-15) Glazing and Privacy ScreeningSSD-8449-Mod-8
Amendments to the internal design of Bays 5-8 of the Locomotive Workshop including the installation of full height glazing along Level 1 of Bays 5-7 (North and South) and privacy screening along Bays 5-7 and Bay 8 (South).
ATP Locomotive Workshop (Bays 5-15) - Mod 12SSD-8449-Mod-12
The proposal is seeking consent for a glazed film in Bays 5-8 of the Locomotive Workshop and minor design changes to Bay 15.
Its 9 documents
9 documents in 4 folders, each on the NSW Planning Portal
Modification Application3
Determination3
Consolidated Consent1
ATP Locomotive Workshop (Bays 5-15) Mod 15SSD-8449-Mod-11
Removal of Heritage Platform within Bay 15 of the Locomotive Workshop
Its 11 documents
11 documents in 3 folders, each on the NSW Planning Portal
Modification Application4
Agency Advice4
ATP Locomotive Workshop (Bays 5-15) Mod 9SSD-8449-Mod-9
Amend the internal design and layout of Bays 5-13 of the Locomotive Workshop, including full height glazing in Bays 5-7, Bay 5 south layout, link bridges in Bay 5 & 7 and a plant room in Bay 9 south.
Its 23 documents
23 documents in 4 folders, each on the NSW Planning Portal
Modification Application4
Agency Advice5
Additional Information11
- 17 July 2020-Attachment A - Architectural Plans
- 17 July 2020-Response to RFI
- 19 August 2020 - Response to RFI
- A - Consultation with Heritage NSW (19/8/20)
- Additional plan: Inter-Column Glazing (1/9/20)
- Applicant Comment on Draft Conditions (2/9/20)
- B - Indicative Elevation and Architectural Renders (19/8/20)
- C - Amended Architectural Plans (19/8/20)
- Further Amended Ground Floor Plan (2/9/20)
- RFI Request for Additional Information_03072020_044143
- RFI Request for Additional Information_31072020_114337
ATP Locomotive Workshop (Bays 5-15) Mod 10SSD-8449-Mod-10
Amendments to enable the installation of photovoltaic panels across the roof of the Locomotive Workshop (Bays 5-15).
Its 8 documents
8 documents in 3 folders, each on the NSW Planning Portal
Modification Application3
Agency Advice2
ATP Locomotive Workshop (Bays 5-15) Mod 7SSD-8449-Mod-7
Modification for internal design and layout changes of Bay 15 of the Locomotive Workshop.
Its 28 documents
28 documents in 4 folders, each on the NSW Planning Portal
Modification Application3
Agency Advice5
Additional Information17
- Attachment A - Amended Architectural Plans
- Attachment A - Amended Bay 15 Section - West Wall
- Attachment A - Design of South Stair
- Attachment B - Amended Bay 15 Section West
- Attachment B - Section West Wall
- Attachment C - Floor Junction Detail
- Bay 15 West elevation windows
- Comment on Draft Condition
- RFI Request for Additional Information_03042020_041648
- RFI Request for Additional Information_15042020_093203
- RFI Request for Additional Information_18032020_120715
- RFI Request for Additional Information_28022020_042828
- RFI Request for Additional Information_29052020_035312
- Response to Submissions
- Response to Submissions (MOD 7, SSD 8449)
- Response to Submissions 18.04.20
- Response to Submissions 4 (001) 25.05.20
ATP Locomotive Workshop (Bays 5-15) Mod 4SSD-8449-Mod-4
Internal amendments to Bays 5 - 15, including new access bridges on Level 1, changes to staircases and lifts, increase the size of the atrium, new sliding glass barrier and provision of new plant room.
Its 33 documents
33 documents in 5 folders, each on the NSW Planning Portal
Modification Application3
Agency Advice6
Additional Information20
- Attachment A - Architectural Plans (Clouding)
- Attachment A - Commercial Travel Distance
- Attachment A - Meeting Minutes
- Attachment B - Amended Heritage Impact Statement
- Attachment B - Fire Engineering Statement
- Attachment C - BCA Statement
- Attachment C - Render - Bay 6 Bridge
- Attachment D - Design of Sliding Barrier
- Attachment D - Render - Bay 6 Bridge, Level 1
- Attachment E - Render - Bay 6 (North) Bridge
- Attachment E - Render of Sliding Barrier
- Attachment F - Render - Bay 11 Bridge
- Attachment G - Render - Gridline 8 Sliding Door
- Attachment H - Design Drawings - Sliding Door
- Attachment I - Design Drawings - Intertenancy Wall
- Attachment J - Amended Architectural Plans
- RFI Request for Additional Information_05112019_033940
- RFI Request for Additional Information_20122019_102647
- Response to RFI
- Response to Request for Information
Consolidated Consent1
ATP Locomotive Workshop (Bays 5-15) Mod 6SSD-8449-Mod-6
Modification of conditions in Part B and E of the consent and to allow the use of tinted glass for heritage windows.
Its 13 documents
13 documents in 4 folders, each on the NSW Planning Portal
Modification Application2
Agency Advice4
Additional Information5
ATP Locomotive Workshop (Bays 5-15) Mod 5SSD-8449-Mod-5
Modification to install additional skylights to Bays 5-15 of the Locomotive Workshop.
Its 9 documents
9 documents in 4 folders, each on the NSW Planning Portal
Modification Application3
Additional Information2
ATP Locomotive Workshop (Bays 5-15) Mod 1SSD-8449-Mod-1
Modification to Condition B25 (Stormwater and Drainage) for the development consent for the Locomotive Workshop Bays 5-15 (SSD 8449).
Its 16 documents
16 documents in 6 folders, each on the NSW Planning Portal
Early Consultation1
Modification Application4
Additional Information6
Recommendation3
ATP Locomotive Workshop (Bays 5-15) Mod 3SSD-8449-Mod-3
Modify the location and configuration of service pods within Bays 5-13 of the Locomotive Workshop, to reconfigure and relocate the pods towards the centre of the floorplate.
Its 5 documents
5 documents in 3 folders, each on the NSW Planning Portal
Modification Application1
ATP Locomotive Workshop (Bays 5-15) Mod 2SSD-8449-Mod-2
Modification to Condition D6 (Construction Hours) of the development consent for the Locomotive Workshop Bays 5-15 (SSD 8449).
Its 10 documents
10 documents in 6 folders, each on the NSW Planning Portal
Early Consultation2
Preparation of Modification Report1
Modification Application3
Additional Information1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
132 documents in 13 folders, each on the NSW Planning Portal
Application54
- Appendix A_ SEARs.pdf
- Appendix C_ Architectural Design Report_Part1.pdf
- Appendix C_ Architectural Design Report_Part2.pdf
- Appendix D_ Quantity Surveyors Report.pdf
- Appendix E_ Site Survey Plans.pdf
- Appendix F_ Geotechnical Investigation Report.pdf
- Appendix G_ Stormwater & Hydraulic Infrastructure Se...
- Appendix H_ Electrical Services Report.pdf
- Appendix I_ Hazardous Materials Report.pdf
- Appendix J_ Structural Design Report.pdf
- Appendix K_ Heritage and Archaeological Impact State...
- Appendix L_ Illumination Strategy and Lighting Repor...
- Appendix M_ Landscape Design Report.pdf
- Appendix N_ Transport Impact Assessment_Part1.pdf
- Appendix N_ Transport Impact Assessment_Part2.pdf
- Appendix O_ Operational Plan of Management.pdf
- Appendix P_ Operational Waste Management Plan.pdf
- Appendix Q_ Ecological Sustainable Development Repor...
- Appendix R_ Stakeholder and Community Engagement Rep...
- Appendix S_ Acoustic Assessment.pdf
- Appendix T_ Remedial Action Plan_Part1.pdf
- Appendix T_ Remedial Action Plan_Part2.pdf
- Appendix T_ Remedial Action Plan_Part3.pdf
- Appendix U_Rail Corridor Impact Statement.pdf
- Appendix V_0_Preliminary Construction Environmental ...
- Appendix V_1__Waste Management Plan_ Locomotive Work...
- Appendix V_2__Air Quality Managment Plan_ Locomotive...
- Appendix V_3__Water and Wastewater Management Plan_ ...
- Appendix V_4_Dial a Dump WMP.pdf
- Appendix V_5_Workplace Risk Management Plan.pdf
- Appendix W_ Access Review.pdf
- Appendix X_ DDA Statement.pdf
- Appendix Y_ BCA Statement.pdf
- Appendix Z_ Fire Safety Engineering Statement.pdf
- SA-AR-DWG-BB-B4-0200_M_ Cover Page and drawing list.pdf
- SA-AR-DWG-BB-B4-0202_K_ Site plan.pdf
- SA-AR-DWG-BB-B4-0203_I_ Site analysis.pdf
- SA-AR-DWG-BB-B4-0210_J_ Existing and demolition plan...
- SA-AR-DWG-BB-B4-0211_J_ Existing and demolition plan...
- SA-AR-DWG-BB-B4-0212_J_ Existing and demolition plan...
- SA-AR-DWG-BB-B4-0214_J_ Existing and demolition plan...
- SA-AR-DWG-BB-B4-0220_I_ Existing elevations.pdf
- SA-AR-DWG-BB-B4-0221_I_ Demolition elevations.pdf
- SA-AR-DWG-BB-B4-0225_I_ Existing sections.pdf
- SA-AR-DWG-BB-B4-0226_I_ Demolition sections.pdf
- SA-AR-DWG-BB-B4-0230_M_ proposed plan ground floor.pdf
- SA-AR-DWG-BB-B4-0231_K_ proposed plan first floor.pdf
- SA-AR-DWG-BB-B4-0232_F_ proposed plan second floor.pdf
- SA-AR-DWG-BB-B4-0234_J_ proposed plan roof.pdf
- SA-AR-DWG-BB-B4-0240_I_ Proposed elevations.pdf
- SA-AR-DWG-BB-B4-0245_I_ Proposed sections.pdf
- SA-AR-DWG-BB-B4-0250_I_ GFA plans bays 5-15.pdf
- SA-AR-DWG-BB-B4-0261_H_ Signage elevations.pdf
- SSDA 8449 Environmental Impact Assessment .pdf
Request for SEARs2
Submissions2
Response to Submissions39
- 2018-06-12 Appendix A_ Response to Issue Schedule_ G...
- 2018-06-12 Appendix B_ Response to Issue Schedule_ P...
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0200_R_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0202_O_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0203_M_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0210_N_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0211_N_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0212_M_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0214_N_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0220_M_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0221_M_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0225_L_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0226_M_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0230_S_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0231_R_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0232_L_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0234_P_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0240_P_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0245_O_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0250_M_.pdf
- 2018-06-12 Appendix C_ SA-AR-DWG-BB-B4-0261_N_.pdf
- 2018-06-12 Appendix D_ Heritage Response Report.pdf
- 2018-06-12 Appendix E_ Framework of Interpretation S...
- 2018-06-12 Appendix F_ SSDA 8449 Suggested Condition...
- 2018-06-12 Appendix G_ Structural Statement.pdf
- 2018-06-12 Appendix H_ Response to Submissions Packa...
- 2018-06-12 Appendix H_ Response to Submissions Packa...
- 2018-06-12 Appendix H_ Response to Submissions Packa...
- 2018-06-12 Appendix H_ Response to Submissions Packa...
- 2018-06-12 Appendix H_ Response to Submissions Packa...
- 2018-06-12 Appendix H_ Response to Submissions Packa...
- 2018-06-12 Appendix H_ Response to Submissions Packa...
- 2018-06-12 Appendix H_ Response to Submissions Packa...
- 2018-06-12 Appendix H_ Response to Submissions Packa...
- 2018-06-12 Appendix I_ Traffic and Transport Respons...
- 2018-06-12 Appendix I_ Traffic and Transport Respons...
- 2018-06-12 Appendix J_ Accessibility Compliance Lett...
- 2018-06-12 Appendix K_ BCA Statement.pdf
- 2018-06-12 SSDA 8449 BAYS 5-15_ LOCOMOTIVE WORKSHOP ...
Additional Information9
- 2018-08-07 Attachment A_ Updated Arborist Report.pdf
- 2018-08-07 Attachment B_ Arborist Report for SSDA 73...
- 2018-08-07 Attachment C_ Updated Public Domain Plans...
- 2018-08-07 Attachment D_ Updated Architectural Drawi...
- 2018-08-07 Attachment E_ Structural Statement.PDF
- 2018-08-07 Attachment F_ Civil Works Statement.pdf
- 2018-08-07 Attachment G_ Design integrity statement.pdf
- 2018-08-07 Attachment H_ Overarching Framework of In...
- 2018-08-07 SSDA 8517 and SSDA 8449 RFI Response.pdf
Recommendation4
Management Plans and Strategies5
Reports1
Independent Reviews and Audits3
Notifications1
Other Documents8
- Condition B38B - 210720_Mirvac Response to RFI letter
- Condition B38B - Approval of Plan Strategy
- E11 2 Locomotive Street, Eveleigh - External_Rev B
- E11 Council Assets_Rev B
- E11 Locomotive Workshops - Rev B
- post-construction dilapidation report External
- post-construction dilapidation report Internal
- post-construction dilapidation report Public Domain
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.