Atlassian - Office and Hotel Development
Where it is in the process
Approved on 15 Oct 2021
What it proposes
The department's description
Office and Hotel Tower and Adaptive Reuse of the Former Inwards Parcel Sheds
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
22 submissions: 7 from the public, 2 from organisations and 13 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
15 changes to the project after its decision, each assessed as a case of its own, newest first.
Atlassian Central Modification 15SSD-10405-Mod-15
Minor amendments to the approved stratum subdivision, including changing the subdivision layout from four (4) lots to five (5) lots.
SSD - 10405 - Modification 12SSD-10405-Mod-12
Minor internal layout adjustments, realignment of facade, removal of planter box and modification to Condition G49.
Atlassian Headquarters MOD 14 - Modification to SubdivisionSSD-10405-Mod-14
Modification to Subdivision
Its 10 documents
10 documents in 4 folders, each on the NSW Planning Portal
Modification Application3
Agency Advice3
Determination3
Consolidated Consent1
Atlassian Headquarters MOD 13SSD-10405-Mod-13
Minor internal amendments, removal of a planter box and modification to the northern elevation at ground level.
Its 12 documents
12 documents in 3 folders, each on the NSW Planning Portal
Modification Application8
Determination3
Consolidated Consent1
Atlassian Headquaters MOD 11 - Event SpaceSSD-10405-Mod-11
Alterations to the crown event space and stairs on levels 35, 37 and 38 of the Atlassian tower, Lee Street, Haymarket, approved on 28 Oct 2025.
The department's description
Alterations to the crown event space and stairs on levels 35, 37 and 38
Its 12 documents
12 documents in 4 folders, each on the NSW Planning Portal
Modification Application7
Agency Advice1
Consolidated Consent1
Atlassian Headquaters MOD 10 - Construction HoursSSD-10405-Mod-10
Minor amendments to construction hours to allow for internal fitout works and design amendments to building light, landscape planters and cupboard doors.
Its 20 documents
20 documents in 5 folders, each on the NSW Planning Portal
Modification Application6
Agency Advice3
Additional Information7
Consolidated Consent1
Atlassian Headquarters MOD 9 - Alterations to CrownSSD-10405-Mod-9
Minor internal and external alterations to tower crown levels, including introduction of event use
Its 17 documents
17 documents in 4 folders, each on the NSW Planning Portal
Modification Application11
- Appendix B - Design Report & Arch Plans Updated
- Appendix C - BCA Statement
- Appendix D - DDA Statement
- Appendix E - Acoustic Statement
- Appendix F - Fire Engineer Statement
- Appendix G - Design Mechanical Statement
- Appendix H - Structural Statement
- Appendix I - DIP Endorsement MOD 9
- Appendix J - Addendum Acoustic Statement
- Section 4.55(1A) Modification Report - Mod 9_18Dec
- Superseded Mod Report Section 4.55(1A) Modification Report - Mod 9
Consolidated Consent1
Atlassian Headquarters MOD 8 - Tower CoreSSD-10405-Mod-8
Amendments to the materiality of the megacolumns, tower core and tower level 1 soffit design and reinstate upper ground level retail tenancy removed in previous modification.
Its 22 documents
22 documents in 6 folders, each on the NSW Planning Portal
Early Consultation8
Modification Application1
Agency Advice4
Additional Information5
Consolidated Consent1
Atlassian Headquarters MOD 7 - Shed Roof and StairsSSD-10405-Mod-7
Redesign of Inwards Parcel Shed roof and southern stair, amendments to the OSD pavilion and landscaping and tower façade and internal amendment to Basement to OSD level and YHA levels
Its 31 documents
31 documents in 5 folders, each on the NSW Planning Portal
Modification Application13
- 20240603 TfNSW Notice - Mod 7 to Atlassian
- Appendix B Architectural Design Report and Plans
- Appendix C Heritage Impact Statement
- Appendix D Design Compliance Statement
- Appendix E Landscape Design Plans
- Appendix F Mechanical Statement
- Appendix G Acoustic Statement
- Appendix H BCA Statement
- Appendix I Accessibility Statement
- Appendix J Building Access Statement
- DIP Endorsement MOD 7 - 8-10 Lee Street Haymarket_Final
- DIP Endorsement MOD 7 Southern Stair_Final
- Mod 7 SSD10405 - 8-10 Lee St Haymarket
Agency Advice5
Additional Information4
Determination8
Consolidated Consent1
Atlassian Headquarters MOD 6 - Retail ChangesSSD-10405-Mod-6
- Deletion of the Adina goods lift and add a new retail goods lift - Combine retail tenancies at lower ground level - Minor changes to gross floor area - Changes to public art conditions
Its 20 documents
20 documents in 5 folders, each on the NSW Planning Portal
Modification Application7
Agency Advice3
Additional Information1
Determination8
Consolidated Consent1
Atlassian Headquarters MOD 5 - Design AmendmentsSSD-10405-Mod-5
Design amendments to the YHA bedrooms, tower crown levels and Ambulance Avenue Wall arches.
Its 18 documents
18 documents in 5 folders, each on the NSW Planning Portal
Modification Application9
- Appendix B - Architectural Design Report and Plans
- Appendix C - Heritage Statement
- Appendix D - Acoustic Statement
- Appendix E - Pedestrian Movement Advice
- Appendix F - BCA Statement
- Appendix G - Facade Engineering Letter
- Appendix H - Access Design Statement
- Design Integrity Panel Endorsement
- Modification Report
Agency Advice3
Additional Information2
Consolidated Consent1
Atlassian Headquarters MOD 4 - Design AmendmentsSSD-10405-Mod-4
Minor modifications to basement level 1, YHA lobby level, upper link zone skylights, DDA access lift within the public domain, and materiality of jack arches within the lower ground link zone.
Its 21 documents
21 documents in 5 folders, each on the NSW Planning Portal
Modification Application10
- Appendix A - Architectural Design Report and Plans
- Appendix B - Heritage Statement
- Appendix C - Landscape Plans
- Appendix D - BCA Capability Statement
- Appendix E- Structural Statement
- Appendix F - Access Design Statement
- Appendix G - Pedestrian Movement
- Appendix H - DIP Endorsement MOD 4
- Appendix I - Daylight Access Study
- Modification Report
Agency Advice3
Additional Information4
Consolidated Consent1
Atlassian Headquarters MOD 3 - Tower DesignSSD-10405-Mod-3
Design changes including restacking of the tower structure, habitat design changes, facade modifications, and increasing the GFA.
Its 23 documents
23 documents in 5 folders, each on the NSW Planning Portal
Modification Application10
- Appendix A - Updated Project Description
- Appendix B - Statutory Compliance Assessment
- Appendix C - Design Integrity Panel Feedback
- Appendix D - MOD3 Design Report
- Appendix E - Acoustic Statement
- Appendix F - BCA Capability Statement
- Appendix G - Fire Statement June 2022
- Appendix H- ESD and Services Statement
- Appendix I - Structural Statement
- Modification Report
Agency Advice4
Additional Information2
Determination6
Consolidated Consent1
Atlassian Headquarters MOD 2 - Design ChangesSSD-10405-Mod-2
Minor design changes, changes to respite periods and amendment to construction staging and the timing of construction certificates.
Its 31 documents
31 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
Modification Application9
- Appendix A - Updated Project Description
- Appendix B - Architectural Plans and Design Report
- Appendix C - Revised Waste Management Report
- Appendix D - Heritage Statement
- Appendix E - Traffic Statement
- Appendix F - Transport Infrastructure Impact Assessment
- Appendix G - Acoustic Statement
- Appendix H - Construction Noise Vib and Dust Mgmt Plan
- Modification Report - MOD 2 - 8-10 Lee Street, Haymarket
Response to Submissions3
Agency Advice4
Additional Information9
- 20221028_City of Sydney Advice
- Amended Acoustic Statement - MOD 2 - 25.10.2022
- Amended General Arrangement Plan_Basement 2
- Appendix A - Amended Basement 2 Plans
- RFI Response - Atlassian Central SSD-10405 MOD2
- Request for Additional Information_01112022_112939
- Request for Additional Information_18112022_121839
- Updated CNVMP
- Vehicle Swept Path Analysis_Basement Level 2
Determination4
Consolidated Consent1
Atlassian Headquarters MOD 1 - Design ChangesSSD-10405-Mod-1
A minor modification to the basement retaining wall design, amendment to the definition of construction/building works and administrative amendments to various Conditions in Section C and Part E.
Its 14 documents
14 documents in 5 folders, each on the NSW Planning Portal
Modification Application3
Agency Advice3
Additional Information4
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
216 documents in 16 folders, each on the NSW Planning Portal
Early Consultation1
Notice of Exhibition1
Request for SEARs2
EIS40
- Appendix A - SEARs
- Appendix A1 - Draft Western Gateway Design Guide
- Appendix AA - Waste Management Report
- Appendix B - SEARs Response Table
- Appendix BB - Building Services Utility Report
- Appendix C - Quantity Surveyors Report
- Appendix CC - Site Investigation (Contamination)
- Appendix D - Title and Survey Plans
- Appendix DD - Remediation Action Plan
- Appendix DD1 - Site Auditor Interim Advice
- Appendix E - Architectural Plans and Design Report
- Appendix EE - Geotechnical Investigation Report
- Appendix F - Endorsed Design Excellence Strategy
- Appendix FF - BCA, Access and DDA Assessment
- Appendix G - Design Competition Report
- Appendix GG - Consultation Report
- Appendix H - Design Integrity Endorsement
- Appendix HH - Public Art Strategy
- Appendix I - Heritage Impact Statement
- Appendix II - Model
- Appendix J - Heritage Conservation Mgmt Plan
- Appendix K - Historical Archaeological Assessment
- Appendix L - Aboriginal Cultural Heritage
- Appendix L1 (Appendix B of ACHA) - Geotech Data
- Appendix M - Transport Impact Assessment
- Appendix M1 - Loading Dock Management Plan
- Appendix N - Transport Infrastructure Assessment
- Appendix O - Construction Ped Traffic Mgmt Plan
- Appendix P - Noise and Vibration Assessment
- Appendix Q - ESD Report
- Appendix R - Civil, Stormwater and Flood Report
- Appendix S - Visual Impact Assessment
- Appendix T - Wind Impact Assessment
- Appendix U - Air Quality Assessment
- Appendix V - External Reflectivity Assessment
- Appendix W - Social Impact Assessment
- Appendix X - CPTED Report
- Appendix Y - Biodiversity Assessment Waiver
- Appendix Z - Prelim Construction Management Plan
- Environmental Impact Statement
Response to Submissions24
- Aboriginal Cultural Heritage Assessment
- Appendix A_Design Integrity Panel Feedback_
- Appendix B_Supp Design Report and Arch Plans_P1_
- Appendix B_Supp Design Report and Arch Plans_P2_
- Appendix B_Supp Design Report and Arch Plans_P3_
- Appendix C1_Subdivision Plans_
- Appendix C2_Preferred DA Conditions - Subdivision_
- Appendix D_Heritage Response Report_Superseded by Updated Appendix D
- Appendix E_Traffic and Access Response Report_
- Appendix F_ESD Response Report_
- Appendix G_Acoustic, Noise and Vibration Response_
- Appendix H_Wind Environment Report_ (1)
- Appendix I_Civil Response Report_
- Appendix J_Updated Trans Infra Impact Asmt_
- Appendix K_Air Quality Response Memo_
- Appendix L_Updated Prelim Construction Mgmt Plan_
- Appendix M_CPS Letter of Support_
- Appendix N_TOGA Letter of Support_
- Appendix O_Draft YHA Plan of Management_
- Appendix P_Addendum Cost Summary Statement_
- Appendix Q_Site Auditor Interim Advice Letter_
- Appendix R_WGDG Compliance Table_
- Response to Submissions Report_SSD-10405
- Updated Appendix D Heritage Response Report
Agency Advice27
- Atlassian - Office and Hotel Dev (SSD-10405)
- Atlassian Development - SSD-10405 - EPA comments
- CoS - 8-10 Lee St Haymarket - SSD10405
- CoS to DPIE - Atlassian
- CoS to DPIE Atlassian RtS
- DPIE Water response
- DPIE Water response
- EES response - 8-10 Lee St - SEARs - 9 Dec 2019
- EPA Response - Request for SEARs - SSD 10405
- HNSW ACH - SSD-10405 Atlassian RTS
- HNSW ACH - SSD-10405 Atlassian Supplementary RTS
- Response 8-10 Lee St - SEARs - 9 Dec 2019.
- Response to EIS - SSD 10405
- SEARs - 8-10 Lee St Haymarket - SSD10405
- SEARs - 8-10 Lee St Haymarket - SSD10405
- SSD 10405 - RTS response
- SSD 10405 - Sup. RTS esponse
- SSD 10405 - response
- SSD 10405 8-10 SEARS response
- SSD-10405- No Comment Letter
- Signed letter SSD 10405
- Sydney Water email (SSD-10405)
- TfNSW_ Atlassian (SSD-10405) - Supplementary RtS
- TfNSW_ Atlassian (SSD-10405) - Supplementary RtS
- TfNSW_Atlassian Development (SSD-10405)
- TfNSW_Atlassian Development (SSD-10405) - RtS
- TfNSW_SEARs for 8-10 Lee St, Haymarket (SSD-10405)
Amendments1
Additional Information7
Determination12
- Atlassian (SSD -10405) Assessment Report
- Atlassian (SSD -10405) Instrument of Consent
- Notice of decision
- SSD-10405 Stamped Plans Part 1 of 9
- SSD-10405 Stamped Plans Part 2 of 9
- SSD-10405 Stamped Plans Part 3 of 9
- SSD-10405 Stamped Plans Part 4 of 9
- SSD-10405 Stamped Plans Part 5 of 9
- SSD-10405 Stamped Plans Part 6 of 9
- SSD-10405 Stamped Plans Part 7 of 9
- SSD-10405 Stamped Plans Part 8 of 9
- SSD-10405 Stamped Plans Part 9 of 9
Post-determination Notices1
Management Plans and Strategies39
- ATR_LGF_UGF_Adina_FNL01_221130
- App J - Unexpected Finds Protocol - Aboriginal and Heritage
- Appendix A - Eastern Elevation Management Plan
- Appendix B - Devonshire Street Tunnel Management Plan
- Appendix C - Railway Colonnade Drive Management Plan
- Appendix D - Construction Traffic and Ped Mgmt Sub-Plan
- Appendix E - Construction Noise Vib and Dust Mgmt Plan
- Appendix F - BOJV Construction Waste Management Plan
- Appendix G - Construction Soil and Water Mgmt Sub Plan
- Appendix G1 - Erosion and Sediment Control Plan
- Appendix H - Construction Flood Emergency Response Sub-Plan
- Appendix I - Unexpected Finds Protocol - Contamination
- Appendix K - Waste Classification Procedure
- Approval Letter - Condition D4
- Approval of Plan Strategy or Study Atlassian D34
- Approval of Plan Strategy or Study_02122022_022428
- Approval of Plan Strategy or Study_18082022_035650
- Approval of Plan Strategy or Study_31012023_021422
- Atlassian D32 CC4 Approval of Plan Strategy or Study
- Atlassian D32 CC4 HIP_Cover Letter
- Condition C4 - Approval of DDHFM
- Condition C4 - DDHFM
- Condition C5 - SRDEP Rev 8
- Condition C6 - Approval letter of THPP
- Condition C6 - Erosion and Sediment Control Plan Rev D 09062022
- Condition C6 - Report on Impact Assessment
- Condition C6 - SWMP 16052022
- Condition C6 - Supplementary Geotechnical Investigation
- Condition C6 - THPP Rev 7 06062022
- Condition D62 - SRDEP Rev 12 - 24 Jan 2024
- Condition E15 - Construction Environmental Management Plan
- Condition G17 - Green Travel Plan
- Conditions E26 & E27 - Dewatering Management Plan
- Cover Letter - CEMP
- G12 - VAOMP Letter
- G12 MODE by YHA VAOMP - Final
- Heritage Management Plan_FINAL_3 August 2022
- Updated Archaeological Test Excavation Report
- Updated Wind Impact Assessment
Reports7
Independent Reviews and Audits1
Notifications1
Other Documents50
- 12082024 - Final details of materials and finishes
- 240905 Atlassian External Wall System Disclosure Statement
- 240905 CORE-REP-WPS001[03] Atlassian
- ATLASS~1
- Approval Letter
- Approval of Plan Strategy or Study
- Approval of Plan Strategy or Study
- Approval of Plan Strategy or Study
- Approval of Plan Strategy or Study
- Atlassian Central_Condition C8_Archival files
- Attachment A - PA30 Landscape Plans
- CC5_DwC Summary Report - Atlassian Central_22.11.24
- CORE-REP-WPS001(B1) Appendix B1
- CORE-REP-WPS001(B3) Appendix B3
- CORE-REP-WPS001(B4) Appendix B4
- CORE-REP-WPS001(C1) Appendix C1
- CORE-REP-WPS001(C2) Appendix C2
- CORE-REP-WPS001[03] Atlassian
- Condition A10 Satisfaction_Cover Letter
- Condition C1 - Heritage Consultant Engagement
- Condition D32 - Updated Heritage Interpretation Plan
- Condition E23 Cover Letter
- Confirmation of Site Auditor Accreditation
- D3 Conservation works Documentation
- D3 Heritage Advice
- D3 TECHNICAL REFERENCE SCHEDULE
- D5_Landscape Plans
- D72 - Approval Letter
- D72- Relevant Documents
- Disclosure Statement Annexure 1
- Disclosure Statement Annexure 10
- Disclosure Statement Annexure 11
- Disclosure Statement Annexure 12
- Disclosure Statement Annexure 13
- Disclosure Statement Annexure 14
- Disclosure Statement Annexure 15
- Disclosure Statement Annexure 16
- Disclosure Statement Annexure 2
- Disclosure Statement Annexure 3
- Disclosure Statement Annexure 4
- Disclosure Statement Annexure 5
- Disclosure Statement Annexure 6a
- Disclosure Statement Annexure 6b
- Disclosure Statement Annexure 7a
- Disclosure Statement Annexure 7b
- Disclosure Statement Annexure 8
- Disclosure Statement Annexure 9
- Evidence of Site Auditor Engagement
- Photographic Archival Recording
- Planting Specification
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.