Alterations and Additions to Waverley College
Where it is in the process
Approved on 26 Aug 2025
What it proposes
The department's description
Alterations and additions to Waverley College including demolition works, refurbished Centenary Building, library extension, construction of a new 6 storey building, new sports facilities, landscaping and ancillary works.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
52 submissions: 48 from the public, 2 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
MOD 1 - Minor design changesSSD-42425537-Mod-1
Minor changes to the approved design, including relocation and size increase of the HVAC system associated with the PAC, addition of an awning at the lift entrance on the roof of Building 1 and changes to the layout of the Centenary Building.
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
104 documents in 10 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs5
SEARs3
Development Application1
EIS41
- Appendix A ACHAR
- Appendix AA Preliminary Site Investigation
- Appendix B Access Report
- Appendix BB SEARs Table
- Appendix C Arboricultural Impact Assessment
- Appendix CC Social Impact Assessment
- Appendix D Architectural Design Report
- Appendix DD SSDA Sustainable Development Strategy
- Appendix E Architectural Plans
- Appendix EE Statement of Heritage Impact
- Appendix F BCA Compliance Statement
- Appendix FF Statutory Compliance Table
- Appendix G Biodiversity Assessment Report Waiver
- Appendix GG Survey Plan
- Appendix H BDAR Waiver
- Appendix HH Targeted Site Investigation
- Appendix I Communications and Engagement Strategy
- Appendix II Traffic Impact Assessment
- Appendix J Conservation Management Plan
- Appendix JJ Visual Impact Assessment
- Appendix K Construction & Demolition Waste Management
- Appendix KK Engagement Outcomes Report
- Appendix L Estimated Development Cost Report
- Appendix M Geotechnical Desktop Study
- Appendix N Green Travel Plan
- Appendix O Hazardous Material Survey – ChapelLibrary
- Appendix P Hazardous Material Survey – Conlon Building
- Appendix Q Hazardous Material Survey – Main School
- Appendix R Hydraulic & Electrical Services Infrastructure
- Appendix S Integrated Water Management Plan
- Appendix T Landscape Design Report
- Appendix U Landscape Plans
- Appendix V Mitigation Measures
- Appendix W Noise and Vibration Impact Assessment
- Appendix X Operational Waste Management Plan
- Appendix Y Pedestrian Wind Assessment
- Appendix Z Plan of Management
- Application_20241008041153
- Embodied Emissions Form
- Environmental Impact Statement
- Net Zero Statement
Response to Submissions33
- Appendix 1 Copies of Submissions
- Appendix 10 Communications and Engagement Strategy
- Appendix 11 Construction Program
- Appendix 12 Construction Traffic Management Plan
- Appendix 13 Amended CDWM
- Appendix 14 Pedestrian Wind Assessment
- Appendix 15 Amended Noise & Vibration Impact Assessment
- Appendix 16 Updated BDAR Waiver Request
- Appendix 17 Addendum Arboricultural Impact Assessment
- Appendix 18 Conservation Management Plan
- Appendix 19 Landscape Design Report
- Appendix 2 Response to Submissions Architecture Report
- Appendix 20 Amended Landscape Plans
- Appendix 21 Green Travel Plan
- Appendix 22 Ecologically Sustainable Development Report
- Appendix 23 Amended Transport Impact Assessment
- Appendix 24 Integrated Water Management Plan
- Appendix 25 Addendum to the IWMP
- Appendix 26 Aboriginal Cultural Heritage Assessment
- Appendix 27 Historical Archaeological Assessment
- Appendix 28 Updated BDAR Waiver Determination
- Appendix 29 Targeted Site Investigation
- Appendix 3 Architectural Design Report
- Appendix 4 Architectural Plans
- Appendix 5 Visual Impact Assessment
- Appendix 6 Suplimentary Survey Plan
- Appendix 7 Amended Plan of Management
- Appendix 8 Amended Operational Waste Management Report
- Appendix 9 Engagement Outcomes Report
- Attachment A - RTS Additional information
- Mitigation Measures - Post Submission
- Request RTS Letter
- Response to Submissions - Waverley College SSD
Agency Advice12
- Ausgrid Response Waverley College (SSD-42425537)
- BCS Comments on EIS - SSD-42425537
- CPHR RtS Comments (SSD-42425537)
- EPA No Comment Response
- FRNSW - DPHI Response EIS - Waverly College
- HNSW ACH - EIS - Waverley College - SSD-42425537
- HNSW ACH - RTS - Waverley College - SSD-42425537
- HeritageNSW_EH_RtS_SSD-42425537 HMS 10731
- HeritageNSW_EH_SSD-42425537_HMS 7654
- SSD Submission Letter - Waverley College - 13.12.2024
- TfNSW Response - RtS
- TfNSW response - 22.11.24
Determination4
Management Plans and Strategies3
Notifications1
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.