Shop Top Housing 17 Hollywood Ave, Bondi Junction

A 72 m shop top housing tower at Hollywood Ave, Bondi Junction

Under way: at prepare eisHomesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 72 m shop top housing tower at Hollywood Ave, Bondi Junction

The proponent proposes a shop top housing tower at 17 Hollywood Avenue and 110-122 Ebley Street, Bondi Junction, in the Waverley Council area. It would be part 20 and part 22 storeys, up to 72 m high, with ground-floor retail, about 194 apartments and four levels of basement parking for about 160 car spaces. About 10% of the apartments would be affordable housing. It would need a concurrent rezoning to lift the height limit from 32 m to 72 m. No capital investment is stated.

The proponent lodged a scoping report in February 2026 and asked for the Secretary's environmental assessment requirements (SEARs), which have been issued. The case is now at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is exhibited and the public can make submissions. There are no submissions yet. The department then assesses the proposal and decides it.

Maximum building height
72 mScoping Report
Apartments
194 dwellingsScoping Report
Affordable housing share
10%Scoping Report
Car parking spaces
160 car spacesScoping Report
Site area
2,005 m²Scoping Report
Current height limit
32 mScoping Report

The department's description

The proposal seeks to deliver a shop top housing with the provision of affordable housing. The proposed development comprises a part 20 storey and part 22 storey tower, with a maximum height of 72 metres.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.