On the map
State significant infrastructure

Albury to Illabo - Kemp Street Bridge Modification

Withdrawn: withdrawnTransport

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

The department's description

Albury to Illabo project to change the approved project to permit a single road and pedestrian bridge instead of a separate pedestrian bridge in Junee at the location of the proposed Kemp Street bridge.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

What's near it

Where it is

Suburb
Junee
Council area
Junee

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.