301 and 305 Kent Street Concept Hotel Development
Where it is in the process
Approved on 30 Jun 2025
What it proposes
The department's description
Concept development application (Stage 1) to establish building envelopes for a future hotel, including:
- building envelope height up to 108.8m
- use of site as a hotel with ancillary uses
- basement car parking
- vehicular and pedestrian access
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
1 submission: 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
MOD 1 - Kent Street, Concept Hotel DevelopmentSSD-53687734-Mod-1
Amendments to Condition C17 relating to driveway management and vehicular access associated with the existing Right of Way easement
Its 6 documents
6 documents in 3 folders, each on the NSW Planning Portal
Modification Application2
Agency Advice1
Additional Information3
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
77 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs6
EIS35
- Appendix A - SEARs Requirements
- Appendix AA - Heritage Impact Statement
- Appendix B. Statutory Compliance Table
- Appendix BB - Historic Archaeological Assessment
- Appendix C - Community Engagement Summary
- Appendix CC - Social Impact Assessment
- Appendix D - Mitigation Measures
- Appendix DD - Utilitys Report
- Appendix E - Survey Plan
- Appendix EE - Preliminary ASMP
- Appendix F - QS Cost Report
- Appendix FF - Flood Risk Assessment
- Appendix G - Building Envelope Drawings
- Appendix GG - DEP Report
- Appendix H - Indicative Reference Drawings
- Appendix HH - Net Zero Statement
- Appendix I - Architectural Design Report
- Appendix J - Design Excellence Strategy
- Appendix K - Traffic Impact Assessment
- Appendix L - Visual Impact Assessment
- Appendix M - Pedestrian Wind Assessment
- Appendix N - CPTED Report
- Appendix O - ESD Report
- Appendix P - BCA and Accessibility Statement
- Appendix Q - Preliminary Public Art Strategy
- Appendix R - BDAR Waiver
- Appendix S - Noise and Vibration Impact Assessment
- Appendix T - Geotechnical Report
- Appendix U - Stormwater and Civil Report
- Appendix V - Engagement Report
- Appendix W - SDRP Waiver
- Appendix X - Detailed Site Investigation Report
- Appendix Y - Waste Management Plan
- Appendix Z - Aboriginal Cultural Heritage Report
- Environmental Impact Statement
Response to Submissions16
- A_Amended Envelope Plans
- B_Amended Reference Plans
- C_Urban Design Statement
- D_Design Excellence Strategy
- E_Comparative Wind Study
- E_Pedestrian Wind Report
- F_Traffic and Transport Response
- G_Flood Impact Statement
- H_Revised ESD Report
- I_Revised Preliminary Public Art Plan
- J_Revised ACHAR
- K_Comparative Shadow Plans
- K_Shadow Plans
- L_Integrated Water Management Report
- M_Legal Advice
- Submissions Report
Agency Advice9
Additional Information5
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.