242-244 Beecroft Road Epping
Where it is in the process
Approved on 19 Sep 2023
What it proposes
The department's description
Detailed design for construction of a mixed-use development following Concept Approval SSD 8784.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
11 submissions: 10 from the public and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
242-244 Beecroft Road Epping - MOD 1 contributions and substationsSSD-31576972-Mod-1
seeking to allow contributions to be paid prior to Occupation Certificate and alter the design of the approved electrical substations.
Its 7 documents
7 documents in 3 folders, each on the NSW Planning Portal
Modification Application5
Agency Advice1
Additional Information1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
129 documents in 13 folders, each on the NSW Planning Portal
Notice of Exhibition1
Early Consultation1
Request for SEARs1
EIS49
- Appendix 1 Response To SEARS
- Appendix 10 Flood Impact Assessment
- Appendix 11 Quantity Surveyors Report
- Appendix 12 Heritage Impact Statement
- Appendix 13 Aboriginal Heritage Letter
- Appendix 14 ESD Report
- Appendix 15 BASIX Certificate
- Appendix 15A Nathers Certificate
- Appendix 15B Stamped ABSA Plans
- Appendix 16 -Access Report
- Appendix 16A -Access Design Statement
- Appendix 17 BCA Report
- Appendix 18 Traffic and Parking Report
- Appendix 19 Noise and Vibration_Impact_Assessment
- Appendix 2 Architectural Plans
- Appendix 20 Operational Waste Management Plan
- Appendix 21 Stakeholder Engagement Report
- Appendix 22 CPTED Report
- Appendix 23 Arborist Report
- Appendix 24 Structural Report for Metro
- Appendix 25 Pedestrian Wind Environment Study
- Appendix 26 Bushfire Letter
- Appendix 27 Concept Biodiversity Development Assessment Waiver
- Appendix 27 Environment and Heritage Group decision - BDAR waiver
- Appendix 27 Planning and Assessment Group decision - BDAR waiver
- Appendix 28 Detailed Site Investigation
- Appendix 29 -Geotechnical Report
- Appendix 2A Perspectives
- Appendix 3 Architectural Report
- Appendix 30 Preliminary Metro Geotechnical Assessment
- Appendix 31 Water and Sewer Infrastructure Letter
- Appendix 32 Electrical Infrastructure Report
- Appendix 33 Social Impact Assessment
- Appendix 34 Construction Waste Management Plan
- Appendix 35 Remediation Action Plan
- Appendix 36 Registered Affordable Housing Covenant
- Appendix 37 Draft Stratum Subdivsion Plan
- Appendix 38 Clause 4.6 Height
- Appendix 3A -Affordable Housing Schedule
- Appendix 4 Landscape Plans
- Appendix 5 Design Report Landscape
- Appendix 6 Internal Civil Plans
- Appendix 6A -External Civil Plans
- Appendix 6B Public Domain Plans
- Appendix 7 Stormwater Management Report
- Appendix 8 -Survey Plan
- Appendix 9 Visual Impact Assessment Report
- DPE cover letter - BDAR waiver
- Environmental Impact Statement
Response to Submissions25
- Appendix 1, Revised Architectural Plans
- Appendix 10 Geotechnical letter
- Appendix 11 DRAINs Model
- Appendix 12 Tuflow Model
- Appendix 13 Traffic Response to TfNSW Feedback
- Appendix 14 Clause 4.6 Height
- Appendix 15 Through Site Link- Plan of Management
- Appendix 16, Public Domain Plan
- Appendix 17 Revised Flood Report
- Appendix 18 Revised Civil Plans
- Appendix 19 Revised BASIX Certificate
- Appendix 19A Revised Nathers Certificate
- Appendix 19B, Revised ABSA Stamped Plans
- Appendix 2, Revised Landscaping Plans
- Appendix 3 DPE Response April 2023
- Appendix 3A Supplementary DPE Response May 2023
- Appendix 3B State Design Review Panel Response
- Appendix 4, Revised Landscape Design Report
- Appendix 5 Revised Noise and Vibration Report
- Appendix 6 Ventilation Stack Noise letter
- Appendix 7 EV Charging Capacity Letter
- Appendix 8 Access letter
- Appendix 9 Electrolysis Report
- Request RTS Letter - 242-244 Beecroft Road, Epping
- Response To Submissions Report
Agency Advice9
- EPA - EIS response
- Parramatta Council - EIS detailed supplementary response
- Parramatta Council - EIS preliminary response
- Parramatta Council - RTS response
- Sydney Metro Corridor Protection - EIS response
- Sydney Metro Corridor Protection - RTS response
- TfNSW - RTS Response
- Transport for NSW - EIS response
- Transport for NSW holding response
Recommendation2
Determination11
- Development consent
- SSD-31576972 Stamped Plans Part 1 of 9
- SSD-31576972 Stamped Plans Part 2 of 9
- SSD-31576972 Stamped Plans Part 3 of 9
- SSD-31576972 Stamped Plans Part 4 of 9
- SSD-31576972 Stamped Plans Part 5 of 9
- SSD-31576972 Stamped Plans Part 6 of 9
- SSD-31576972 Stamped Plans Part 7 of 9
- SSD-31576972 Stamped Plans Part 8 of 9
- SSD-31576972 Stamped Plans Part 9 of 9
- Statement of reasons for decision
Management Plans and Strategies6
Independent Reviews and Audits1
Notifications8
Other Documents14
- Architects Covering Letter Conditions B1 and B2
- Other
- PA 2 letter - SSD-31576972 - B1 and B2 - Design amendments
- PA 7 Letter
- Post Approval Form_20240909020602
- Revised Architectural Plans
- Revised Landscape Plan
- Revised schedule finishes and materials
- SS21-4819_001_K
- SS21-4819_002_O
- SS21-4819_105_M
- SS21-4819_106_O
- SSD-31576972-PA-2_18092024084250
- Schedule of Finishes and Materials
What's near it
Where it is
- Suburb
- Epping
- Council area
- Parramatta
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.