201 Elizabeth Street Redevelopment - Stage 2
Where it is in the process
Approved on 19 Jun 2025
What it proposes
The department's description
City of Sydney D/2024/854
Stage 2 application for demolition, tree removal, remediation, bulk excavation and construction of a 55-storey mixed use development with a 441 key hotel, 264 apartments, retail, five level basement and 271 car spaces.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
4 submissions: 4 from the public
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
93 documents in 6 folders, each on the NSW Planning Portal
Request for SEARs1
SEARs1
EIS49
- Appendix A - SEARs Compliance Table
- Appendix AA - Transport Impact Assessment
- Appendix B - Architectural Drawings
- Appendix BB - BDAR Waiver
- Appendix C - Statutory Compliance Table
- Appendix CC - Noise and Vibration Impact Assessment
- Appendix D - Community Engagement Table
- Appendix DD - Geotechnical Investigation Report
- Appendix E - Consolidated Mitigation Measures
- Appendix EE - Groundwater Assessment
- Appendix FF - Acid Sulphate Soil and Salinity Assessment
- Appendix G - Survey Plan
- Appendix GG - Intergrated Water Management Plan
- Appendix H - Civil Drawings
- Appendix HH - Flood Assessment
- Appendix I - Public Domain Plan
- Appendix II - Preliminary Site Investigation
- Appendix J - Landscape Drawings
- Appendix JJ - Detailed Site Investigation
- Appendix K - SIA, CPTED & Engagement Report
- Appendix KK - Remediation Action Plan
- Appendix L - Architectural Design Competition Report
- Appendix LL - ACHAR
- Appendix M - Architectural Design Report
- Appendix MM - Heritage Impact Statement
- Appendix N - Landscape Design Report
- Appendix NN - Historical Archaeological Statement
- Appendix O - Connecting with Country Design Report
- Appendix OO - Construction Waste Management Plan
- Appendix P - BCA & Fire Safety Report
- Appendix PP - Operational Waste Management Plan
- Appendix Q - Access Assessment Report
- Appendix QQ - Hazardous Building Materials Report
- Appendix R - Hotel Plan of Management
- Appendix RR – Infrastructure Plan
- Appendix S - Solar Reflectivity Assessment
- Appendix SS - Infrastructure Impact Report
- Appendix T – Pedestrian Wind Assessment
- Appendix TT - CCT Geotechnical Impact Assessment
- Appendix U - View & Visual Impact Assessment
- Appendix UU - Sydney Metro Geotechnical Impact Assessment
- Appendix V - Design Verification Statement
- Appendix X - Arborist Report
- Appendix Y - Sustainability Summary
- Appendix Y1 - Net Zero Statement
- Appendix Z - Embodied Carbon Report
- Application_20240925014756
- Environmental Impact Statement
- Notification Letter - D2024854
Response to Submissions27
- Attachment A - Design Response
- Attachment B - Landscape Response
- Attachment C - Transport Response
- Attachment D - Updated Arboricultural Impact Appraisal
- Attachment E - Sun Eye View Diagrams
- Attachment F - Demolition Drawings
- Attachment G - Acoustic Memorandum
- Attachment H - Ventilation Memorandum
- Attachment I - Natural Ventilation Conditions
- Attachment J - Flooding Response
- Attachment K - MUSIC-Link Report and MUSIC Model
- Attachment L - Updated Construction Waste Management Plan
- Attachment M - Updated Operational Waste Management Plan
- Attachment N - Updated Public Art Strategy
- Attachment O - Updated Noise and Vibration Assessment
- Attachment P - Risk Assessment Report
- Attachment Q - Electrolysis Risk Desktop Study
- Attachment R - Updated Geotechincal Investigation Report
- Attachment S - Updated Geotechincal Review Comments Sheet
- Attachment T - Updated ACHAR
- RFI - Amended Electrolysis Study
- RFI - Amended TAIA
- RFI - BMU Design Statement
- RFI - Geotechnical Peer Review
- RFI - Structural Peer Review
- Request for Additional Information & Amendments - D2024854
- Response to RFI - D-2024-854 & D-2017-349-A
Additional Information11
- 2230666 - Response to RFI
- 250512- Detailed Sun Eye View Diagrams
- 2601 TFA Plans_2
- 2602 TFA Plans_2
- Att E - Arboricultural Impact Statement.pdf
- Attachment B - Updated Landscape Drawings
- Attachment C - Updated Transport Impact Assessment
- Attachment D - Updated Pedestrian Wind Assessment
- Attachment E - Arboricultural Statement
- Attachment F - Updated BCA & Fire Safety Report
- DEP Form_26May25
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.