On the map
State significant development

20-34 Ashford Avenue build to rent

230 affordable apartments at 20-34 Ashford Avenue, Castle Hill

Under way: at prepare eisHomesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Industry Specific SEARs Housing Asford Avenue on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

230 affordable apartments at 20-34 Ashford Avenue, Castle Hill

The proponent proposes to demolish the buildings on the site at 20-34 Ashford Avenue, Castle Hill, in The Hills Shire, and build a residential flat building with basement car parking. It would provide 230 affordable housing apartments. The project is listed as build to rent. No capital investment, building height or floor area is stated.

The project is at the stage where the proponent prepares an environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) were issued on 21 Sep 2026. They tell the proponent what the EIS must cover, including design, traffic, noise, flooding, bushfire, contamination and biodiversity. Next, the proponent lodges the EIS, which is then exhibited for public submissions. None have been made yet. The department then assesses the project and it is decided.

Affordable housing apartments
230 dwellingsPortal page

The department's description

Demolition of buildings on site and construction of a residential flat building with basement car parking, providing 230 affordable housing apartments.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.