Zahra Grammar School

A new 630-student primary school at Eagleview Road, Minto

Under way: at prepare eisEducationNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report for SEARS for Zahra Grammar Minto v2 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A new 630-student primary school at Eagleview Road, Minto

The proponent proposes a new three-stream primary school for a maximum of 630 students and 30 staff at 127 Eagleview Road, Minto, in the Campbelltown area. The site is 20,000 m². The buildings would be up to two intersecting storeys, built in four stages. The existing buildings would be reused and some vegetation removed. About 60 construction jobs are expected. No capital investment is stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The scoping report says earlier assessment requirements issued on 29 Aug 2024 lapsed on 29 Aug 2026, and new ones have been issued. Next, the proponent lodges the EIS, which is then exhibited and open for public submissions. No submissions have been made yet. The department then assesses the application and decides it.

Maximum students
630 studentsPortal page
Staff
30 staffPortal page
Construction jobs
60 jobsScoping Report for SEARS for Zahra Grammar Minto v2
Site area
20,000 m²Scoping Report for SEARS for Zahra Grammar Minto v2
Maximum building height
2 storeysScoping Report for SEARS for Zahra Grammar Minto v2

The department's description

Staged construction and operation of a new primary school in Minto, comprising double storey buildings with tiered outdoor learning space and adaptive reuse of existing buildings, catering for a maximum of 630 students and 30 staff.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.