On the map
State significant development

Yennora Gas Facility Expansion

Air separation unit at the Yennora gas facility, Pine Road

Under way: at prepare eisIndustry and warehousesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Air separation unit at the Yennora gas facility, Pine Road

The proponent proposes alterations and additions to its existing gas manufacturing facility at Pine Road, Yennora, in the Cumberland council area. It would build a new air separation unit that processes 15,000 Nm3/h of air, with storage for 245 m³ of liquid oxygen and 1,225 m³ of liquid nitrogen, plus control rooms and internal site works. The scoping report says it would operate 24 hours a day and add heavy vehicle movements. The development cost, construction jobs and operating jobs are blank in the text.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The scoping report was lodged in June 2026, and the Secretary's environmental assessment requirements (SEARs) have been issued. Next, the EIS would be exhibited and the public could make submissions. There are no submissions yet. The department then assesses it.

Air processed
15,000 Nm3/hScoping Report
Liquid oxygen storage
245 m³Scoping Report
Liquid nitrogen storage
1,225 m³Scoping Report

The department's description

Alterations and additions to Air Liquide's existing gas manufacturing facility including construction of a new Air Separation Unit, ancillary rooms and ancillary site works.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

4 documents in 2 folders, each on the NSW Planning Portal

Request for SEARs1
SEARs3

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.