Yass Solar Farm

Withdrawn: withdrawnEnergy: solarDistrict scale

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

The department's description

The construction, operation and decommissioning of a 100 MW solar photovoltaic energy generating facility with an associated battery energy storage system

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

17 documents in 4 folders, each on the NSW Planning Portal

Early Consultation1

See the document on the Planning Portal

Request for SEARs1

See the document on the Planning Portal

SEARs2

See the 2 documents on the Planning Portal

Agency Advice13

See the 13 documents on the Planning Portal

What's near it

Its point is approximate (the register's own, to about a kilometre), and so are these.

Where it is

Suburb
Bimbi
Council area
Yass Valley

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.