Whytes Gully Waste Facility

Decided: approved with conditions on 3 Apr 2013Waste

Where it is in the process

Approved With Conditions on 3 Apr 2013

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination3 Apr 2013 (done)
  8. Approved With Conditions3 Apr 2013

What it proposes

The portal gives no description.

Modifications

4 changes to the project after its decision, each assessed as a case of its own, newest first.

Modification 3 Eastern Gully Stormwater ChannelMP11_0094-Mod-4

Withdrawn: withdrawn

Design modifications to allow for the realignment of the open channel gravity drainage for full length of channel. The change to an open channel gravity drainage would mean that no pond outlet is required.

Its page on the Planning Portal

Modification 3 Realignment of Stormwater ChannelMP11_0094-Mod-3

Under way: at response to submissions · 2 submissions

Realign the Eastern Gully Stormwater Diversion and extend the site over the aquired easement. The change to open channel gravity drainage would remove the need for a pond outlet. No change to the landfill capacity or waste input rates.

Its 9 documents

9 documents in 5 folders, each on the NSW Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application2

See the 2 documents on the Planning Portal

Response to Submissions1

See the document on the Planning Portal

Agency Advice4

See the 4 documents on the Planning Portal

Additional Information1

See the document on the Planning Portal

Its page on the Planning Portal

Whytes Gully Waste MOD 2 - Stormwater DrainageMP11_0094-Mod-2

Decided: approved on 29 May 2018 by the department (director)

/

Its 11 documents

11 documents in 4 folders, each on the NSW Planning Portal

Application2

See the 2 documents on the Planning Portal

Submissions6

See the 6 documents on the Planning Portal

Response to Submissions1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Whytes Gully Waste MOD 1 - Operting HoursMP11_0094-Mod-1

Decided: approved on 11 Apr 2018 by the department (director)

/

Its 7 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.