On the map
State significant infrastructure

Western Slopes Pipeline

Withdrawn: withdrawnEnergy: other

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

The department's description

Construction and operation of a high pressure gas pipeline connecting the Narrabri Gas Project to the Moomba-Sydney gas pipeline.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

6 documents in 2 folders, each on the NSW Planning Portal

Application2

See the 2 documents on the Planning Portal

SEARs4

See the 4 documents on the Planning Portal

What's near it

Where it is

Suburb
Tenandra
Council areas
Bogan, Cobar, Coonamble, Lachlan, Narrabri, Walgett, Warren

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.