On the map
State significant development

Wala Wala (Dungowan Valley) Pumped Hydro

Wala Wala pumped hydro storage near Dungowan, Tamworth

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Wala Wala pumped hydro storage near Dungowan, Tamworth

The proponent proposes a pumped hydro energy storage project in the Peel Valley, about 45 km south-east of Tamworth, near 313 Dungowan Dam Road, Ogunbil. It would have two new off-river reservoirs joined by an underground pipeline, an underground power station and a grid connection. It is expected to generate 300 to 400 MW for up to 10 hours, with 3,000 MWh of storage. Water supply is still being investigated and would likely come from Dungowan Dam. No capital investment or job numbers are stated.

The proponent has asked for the Secretary's environmental assessment requirements (SEARs), which have been issued, with supplementary requirements. The scoping report is dated 4 Sep 2026. Next, the proponent prepares an environmental impact statement (EIS). It would then be exhibited, when the public can make submissions. There are no submissions yet.

Generating capacity (lower end)
300 MWScoping Report
Generating capacity (upper end)
400 MWScoping Report
Storage capacity
3,000 MWhScoping Report
Distance south-east of Tamworth
45 kmScoping Report

The department's description

Development of a pumped hydro energy storage and generation project, which includes the development of two new off-river water reservoirs, underground pipeline, underground hydro-electric power station, grid connection and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Ogunbil
Council area
Tamworth Regional

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.