On the map
State significant development

UoN Central Coast Campus - Student Accommodation

A 13 storey student accommodation building, 305 Mann Street, Gosford

Under way: at prepare eisEducationNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its UON CC - Scoping Submission on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 13 storey student accommodation building, 305 Mann Street, Gosford

The University of Newcastle proposes a 13 storey building (over a basement) at the rear of its Central Coast Campus site at 305 Mann Street, Gosford, in the Central Coast Council area. It would hold up to 190 student beds, student services, recreation space, a rooftop terrace and 10 car spaces for staff. The building would be about 52.8 m high. The proponent's scoping letter puts the capital investment at about $80,000,000, excluding GST.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The scoping report was dated 7 May 2025 and the Secretary's environmental assessment requirements (SEARs) have been issued. No submissions have been made yet. Next, the EIS is exhibited and the public can make submissions. The proponent then responds, and the department assesses the proposal and decides it.

Capital investment
$80MUON CC - Scoping Submission
Student beds (maximum)
190 bedsUON CC - Scoping Submission
Building height
52.8 mUON CC - Scoping Submission
Building storeys
13 storeysUON CC - Scoping Submission
Staff car spaces
10 car spacesUON CC - Scoping Submission
Site area
4,671.9 m²UON CC - Scoping Submission

The department's description

The construction of a 13 storey building within Stage 2 of the University of Newcastle Central Coast Campus development, comprising student accommodation, student services, recreational uses, a rooftop terrace, car parking and a basement plant.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

3 documents in 2 folders, each on the NSW Planning Portal

Request for SEARs1
SEARs2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.