Uniting Kingscliff Redevelopment
Where it is in the process
Approved on 27 Nov 2025
What it proposes
The department's description
Seniors housing development comprising a residential care facility, independent living units and ancillary facilities.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
319 submissions: 313 from the public, 5 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
1 change to the project after its decision, each assessed as a case of its own, newest first.
Modification 1 Delete Condition A7SSD-47105958-Mod-1
Uniting Kingscliff Redevelopment - Modification 1
Its 5 documents
5 documents in 3 folders, each on the NSW Planning Portal
Modification Application2
Determination2
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
139 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
EIS51
- Appendix A - SEARs Table_V1
- Appendix AA - Statement of Landscape Design Intent_V1
- Appendix AB - Hazardous Materials Risk Report_V1
- Appendix AC - Part A - Connecting with Country_V1
- Appendix AC - Part B - Connecting with Country_V1
- Appendix AD - Part A - BASIX Assessment Report_V1
- Appendix AD - Part B - BASIX and NatHERS certificates_V1
- Appendix AD - Part C1 - BASIX and NatHERS certificates_V1
- Appendix AD - Part C2 - BASIX and NatHERS certificates_V1
- Appendix AD - Part C3 - BASIX and NatHERS certificates_V1
- Appendix AD - Part C4 - BASIX and NatHERS certificates_V1
- Appendix AD - Part D - BASIX and NatHERS certificates_V1
- Appendix AE - Access Report_V1
- Appendix AF - Part A - Section 4.6 Variation_V1
- Appendix AF - Part B - Section 4.6 Variation_V1
- Appendix AG - Ecological Sustainable Development V1
- Appendix AH - State Design Review Panel Meeting Minutes_V1
- Appendix AI - EDC Report
- Appendix AJ - Survey Plan_V1
- Appendix AK - BCA Compliance Report_V1
- Appendix AL - Solar Reflectivity Assessment_V1
- Appendix AM - Green Travel Plan_V1
- Appendix AN - Structural Design Statement_V1
- Appendix AO - Odour Surveys Report_V1
- Appendix B - Part A - Architectural Plans_V1
- Appendix B - Part B - Architectural Plans_V1
- Appendix C - Architectural Design Report_V1
- Appendix D - Title, Deposited Plans and Dealings_V1
- Appendix E - Social Impact Assessment_V1
- Appendix F - Qualitative Wind Assessment_V1
- Appendix G - Flood Impact Assessment Report_V2
- Appendix H - Biodiversity Dev Assessment Report_V1
- Appendix I - Arboricultural Assessment_V1
- Appendix J - Infrastructure Report_V1
- Appendix K – Acid Sulfate Soil Report_V1
- Appendix L - Geotechnical Report_V1
- Appendix M – Aboriginal Cultural Heritage Report_V1
- Appendix N – Archaeological Report_V1
- Appendix O - Statement of Heritage Impact_V1
- Appendix P - Stage 1 Preliminary Site Investigation_V1
- Appendix Q - Cumulative Impact Assesment Table_V1
- Appendix R - Economic Impact Assessment_V1
- Appendix S - Visual Impact Assessment_V1
- Appendix T - View Loss Report (Redacted)_V1
- Appendix U - Flood Emergency Response Plan_V1
- Appendix V - Traffic Impact Assessment_V1
- Appendix W - Construction Noise and Vibration Assessment_V1
- Appendix X - Waste Management Plan_V1
- Appendix Y - Stormwater Management Plan_V1
- Appendix Z - Consultation Outcomes Report Phase 1 & 2_V1
- Environmental Impact Statement - Rev C
Response to Submissions32
- Attachment A - Submissions Register
- Attachment B - TSC Meeting Minutes
- Attachment C - Amended Flood Emergency Response Plan
- Attachment D - Amended Flood Impact Assessment
- Attachment E - Amended Structural Design Statement
- Attachment F - Amended Architectural Plans - Part A
- Attachment F - Amended Architectural Plans - Part B
- Attachment G - Landscape Sections - Part A
- Attachment G - Landscape Sections - Part B
- Attachment H - Amended Visual Impact Assessment
- Attachment I - Amended View Loss Assessment
- Attachment J - Detailed Planing Plans
- Attachment K - Amended BDAR
- Attachment L - Church Parking Demand – Imagery Analysis
- Attachment M - Amended Waste Mgnt Plan
- Attachment N - Amended Design Report - Part A
- Attachment N - Amended Design Report - Part B
- Attachment N - Amended Design Report - Part C
- Attachment N - Amended Design Report - Part D
- Attachment N - Amended Design Report - Part E
- Attachment O - Amended Access Report
- Attachment P - Amended Construction Noise & Vibration
- Attachment Q - Essential Energy EIA
- Attachment R - Lighting Impact Assessment
- Attachment S - Swept Path Analysis (Lorien Way)
- Attachment T - Biodiversity Assessment Response
- Attachment U - Architectural Plans (Climate Change)
- Attachment V - Part A - Stamped Plans
- Attachment V - Part B1 - Stamped Plans
- Attachment V - Part B2 - Stamped Plans
- Planning and Environment Letter
- Response to Submissions - 11 Dec 2024
Agency Advice18
- BCS - EIS
- CPHR RTS Response Sen Housing Kingscliff SSD-7105958
- CPHR Response Seniors Housing SSD-47105958
- Council - EIS (Draft)
- Council - EIS (Final)
- Council Endorsed Submission 21 August 2025
- DCCEEW Water - EIS
- DCCEEW Water(March 2025)
- Draft Tweed Shire Council submission March 2025
- EPA - EIS
- FRNSW - EIS
- HNSW - EIS
- HNSW ACH - EIS
- Independent review of flooding
- NSW SES - EIS
- SES - RTS (March 2025)
- TfNSW - EIS
- Tweed Council Submission (draft) August 2025
Additional Information28
- Appendix K - Amended BDAR-V2
- Appendix W - Hydrogeological Assessment
- Appendix X - ASS Investigation
- Attachment A - Amended Flood Emergency Response Plan (FERP)
- Attachment B - Amended Preliminary Site Investigation-1
- Attachment C - Amended Architectural Plans_Part A
- Attachment C - Amended Architectural Plans_Part B
- Attachment C - Amended Architectural Plans_Part C
- Attachment D - Amended Architectural Design Report_Part A
- Attachment D - Amended Architectural Design Report_Part B
- Attachment D - Amended Architectural Design Report_Part C
- Attachment D - Amended Architectural Design Report_Part D
- Attachment D - Amended Architectural Design Report_Part E
- Attachment D - Amended Architectural Design Report_Part F
- Attachment D - Amended Architectural Design Report_Part G
- Attachment E - Amended Clause 4.6 Variation Request
- Attachment F - Amended Landscape Statement & Drawings
- Attachment G - Hydrogeology Letter
- Attachment H - Services Cover Letter
- Attachment I - Fire Drawings & Statement
- Attachment J - Amended Site Survey
- Attachment K - Amended Acoustic Report
- Attachment L - Amended BDAR + BSCMP_Part A
- Attachment L - Amended BDAR + BSCMP_Part B
- Attachment M - Visual Impact Statement Letter
- Attachment N - Easement Sections
- RFI 2 Response Cover Letter - 11 June 2024
- Updated South Elevation July 2025
Recommendation3
What's near it
Where it is
- Suburb
- Kingscliff
- Council area
- Tweed
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.