Texas Solar Farm
A 400 MW solar farm and battery on Bruxner Way, Texas
Where it is in the process
At prepare eis
What it proposes
AI summary. Written from this project's page and its Texas Solar Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 400 MW solar farm and battery on Bruxner Way, Texas
The proponent proposes a solar farm of up to 400 MW and a battery energy storage system of up to 200 MW / 800 MWh, on rural land at 13738 Bruxner Way, Texas, in the Inverell Shire Council area, near the Queensland border. The site is about 1,600 ha. The solar farm may take about 950 ha, the battery 8 ha and the switching station and substation 3 ha. It would connect to the existing 330 kV transmission line that crosses the site. No capital investment figure is stated beyond "more than $30 million".
The case is at the stage where the proponent prepares its environmental impact statement (EIS). A scoping report dated 22 Mar 2024 was lodged, and the Secretary's environmental assessment requirements (SEARs) have been issued, with a supplementary set. No submissions have been made. Next, the EIS is to be exhibited for public submissions, then the department assesses it.
- Solar farm capacity
- 400 MWTexas Solar Scoping Report
- Battery power capacity
- 200 MWPortal page
- Battery storage capacity
- 800 MWhPortal page
- Site area
- 1,600 haTexas Solar Scoping Report
- Possible solar farm area
- 950 haTexas Solar Scoping Report
- Possible battery area
- 8 haTexas Solar Scoping Report
- Grid connection voltage
- 330 kVTexas Solar Scoping Report
The department's description
Construction, operation, and decommissioning of a 400MW solar farm and Battery Energy Storage System with a capacity of 200MW/800MWh. The development will also include associated infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
18 documents in 4 folders, each on the NSW Planning Portal
Early Consultation2
Request for SEARs1
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.