Temora Battery Energy Storage System

An 80 MW battery at 108 Miners Street, Temora

Under way: at collate submissionsEnergy: batteriesNeighbourhood scale

Where it is in the process

At collate submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (current stage)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Temora BESS EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

An 80 MW battery at 108 Miners Street, Temora

The proponent proposes a battery energy storage system with about 80 MW of power and 364 MWh of storage at 108 Miners Street, Temora, in Temora Shire, about 1 km south-east of the town. It would include an on-site substation, an overhead connection to the adjoining Essential Energy Temora Zone Substation, and upgrades to Miners Street. Construction would employ an average of 40 to 60 workers and the operation 2-3 full-time equivalent staff. No capital investment is stated.

The environmental impact statement (EIS), dated 24 September 2026, has been exhibited. The portal lists the case at the stage of collating submissions, with 40 received: 38 objecting, 1 supporting and 1 commenting. Next, the proponent responds to the submissions and may amend the project. The department then assesses it and the decision follows. No decision date is given.

Battery power capacity
80 MWTemora BESS EIS
Battery storage capacity
364 MWhTemora BESS EIS
Peak construction workforce
80 workersTemora BESS EIS
Development footprint
4.6 haTemora BESS EIS
Native vegetation to be cleared
4.09 haTemora BESS EIS
Public submissions
40 submissionsPortal page

The department's description

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 80MW/364MWh and ancillary infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

40 submissions: 32 from the public and 8 from organisations

Object38
Support1
Comment1

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Temora
Council area
Temora

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.