On the map
State significant development

Summerhill Landfill Renewable Natural Gas Facility

A landfill gas to biomethane facility at Summerhill, Wallsend

Under way: at searsEnergy: otherNeighbourhood scale

Where it is in the process

At sears

  1. SEARs (current stage)
  2. Prepare EIS (to come)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A landfill gas to biomethane facility at Summerhill, Wallsend

The proponent proposes a renewable natural gas facility at the Summerhill Waste Management Centre, 120 Summerhill Road, Wallsend, in the City of Newcastle area. It would upgrade landfill gas into pipeline-quality biomethane, producing up to 500 terajoules a year, and inject it into the gas distribution network. The plant would occupy about 0.5 ha, with a pipeline and electrical corridor about 20 m wide and 1.2 km long. It would operate for about 25 years. No capital investment or job numbers are stated.

The case is at an early stage. A scoping report dated 24 Sep 2026 asks for the Secretary's environmental assessment requirements (SEARs), which are being prepared. Next, the SEARs are issued, then the proponent prepares an environmental impact statement (EIS), which is exhibited for public submissions. No submissions have been made yet. The proponent expects construction to start in 2028, subject to approval.

Production capacity
500 terajoules a yearScoping report
Facility site area
0.5 haScoping report
Pipeline corridor length
1.2 kmScoping report
Pipeline corridor width
20 mScoping report
Operating life
25 yearsScoping report

The department's description

Construction and operation of a landfill gas to biomethane conversion facility including underground pipelines and electricity connections within the Summerhill landfill site, and pipeline connection to the reticulated gas network

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

2 documents in 1 folder, each on the NSW Planning Portal

Request for SEARs2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.