On the map
State significant development

Stuarts Point Sewerage Scheme

A sewerage scheme for Stuarts Point, Grassy Head and Fishermans Reach

Under way: at assessmentWater and sewerageLocal scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Stuarts Point Sewerage Scheme Scoping Report_20230328 on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A sewerage scheme for Stuarts Point, Grassy Head and Fishermans Reach

Kempsey Shire Council proposes a low-pressure sewerage collection system for about 1500 properties across Stuarts Point, Grassy Head and Fishermans Reach, in the Kempsey Shire area. Wastewater would go to a new treatment plant south of Stuarts Point, sized for 5300 equivalent persons. Treated effluent would be disposed of in the dune system between the Pacific Ocean and Macleay Arm, using a pipeline of about two kilometres. The scoping report values the project at over $30 million. Those homes now use their own on-site sewage systems.

The environmental impact statement (EIS) was exhibited and drew 43 submissions: 9 objecting, 30 supporting and 4 commenting. The proponent responded and amended the project. The department asked for further information, and a final biodiversity report is dated September 2026. The department is now assessing the project with advice from other agencies. Next come its assessment report and a decision.

Properties to be connected
1,500 propertiesStuarts Point Sewerage Scheme Scoping Report_20230328
Treatment plant capacity
5,300 equivalent personsStuarts Point Sewerage Scheme Scoping Report_20230328
Capital investment (at least)
$30MStuarts Point Sewerage Scheme Scoping Report_20230328
Effluent transfer pipeline length
2 kilometresStuarts Point Sewerage Scheme Scoping Report_20230328
Effluent disposal area
3 haStuarts Point Sewerage Scheme Scoping Report_20230328

The department's description

Kempsey Shire Council proposes to install and operate a sewerage collection system to properties in Stuarts Point, Grassy Head and Fishermans Reach. The project would include a wastewater treatment plant and disposal of treated effluent.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

43 submissions: 42 from the public and 1 from organisations

Object9
Support30
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

91 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs2
SEARs2
EIS30
Response to Submissions14
Agency Advice21
Amendments14
Additional Information7

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.