On the map
State significant development

St George Hospital - New Emergency Department

A new emergency department at St George Hospital, Kogarah

Decided: approvedHealthNeighbourhood scale

Where it is in the process

Approved

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination (done)
  9. Approved

What it proposes

AI summary. Written from this project's page and its Development Consent.pdf and Assessment Report.pdf on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A new emergency department at St George Hospital, Kogarah

Health Infrastructure proposed a new emergency department at St George Hospital, Gray Street, Kogarah, in the Georges River area. The part one, part two storey building would have 4,900 m² of floor area and be 11.3 m high. It would have 76 treatment spaces and 15 support spaces, and would need Griffith House, a locally listed heritage item, to be demolished. The capital investment is $34,747,000, with 129 construction jobs and 73 operational jobs.

The environmental impact statement (EIS) was exhibited from 23 Aug 2012 to 21 Sep 2012. The portal records 53 public submissions: 40 objecting and 13 commenting. Most concerned the demolition of Griffith House. The department's assessment report of January 2013 supported the project. The Minister for Planning and Infrastructure approved it on 29 Jan 2013, with conditions. These include archival recording of Griffith House, a heritage management plan and limits on construction hours and noise.

Capital investment
$34.7MAssessment Report.pdf
Construction jobs
129 jobsAssessment Report.pdf
Operational jobs
73 jobsAssessment Report.pdf
Gross floor area
4,900 m²Assessment Report.pdf
Building height
11.3 mAssessment Report.pdf
Treatment spaces
76 treatment spacesAssessment Report.pdf
Support spaces
15 support spacesAssessment Report.pdf

The portal gives no description.

Submissions

What the public, organisations and public authorities said, counted by where they stood.

53 submissions: 53 from the public

Object40
Support0
Comment13

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

71 documents in 6 folders, each on the NSW Planning Portal

Request for DGRS2
DGRs2
EIS41
Response to Submissions23
Recommendation1
Determination2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.