St Andrews Seniors Housing, Ballina
79 seniors living units and a care facility, Cherry Street, Ballina
Where it is in the process
At response to submissions
What it proposes
AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
79 seniors living units and a care facility, Cherry Street, Ballina
The proponent proposes to replace the existing St Andrews Village at 140-150 Cherry Street, Ballina, in the Ballina Shire, on a site of about 18,169 m². Four buildings of one to three storeys would hold 79 independent living units, 10 hostel units, a residential aged care facility with 5 beds and a community centre. It would provide 79 resident and 12 visitor car spaces. The village now has 60 two-bedroom units. No capital investment is stated.
The environmental impact statement (EIS), dated August 2026, was prepared after the Secretary's environmental assessment requirements were issued on 26 Nov 2025. It drew 6 submissions: 3 objecting, 1 supporting and 2 commenting. The case is at the response to submissions stage, where the proponent replies to the issues raised and may amend the project. The department then assesses it and decides, or refers it to the Independent Planning Commission.
- Independent living units
- 79 dwellingsEnvironmental Impact Statement
- Hostel units
- 10 unitsEnvironmental Impact Statement
- Residential aged care beds
- 5 bedsEnvironmental Impact Statement
- Resident car spaces
- 79 car spacesEnvironmental Impact Statement
- Visitor car spaces
- 12 car spacesEnvironmental Impact Statement
- Site area
- 18,169 m²Environmental Impact Statement
- Existing independent living units
- 60 dwellingsEnvironmental Impact Statement
The department's description
Demolition of existing structures and construction of a new seniors housing development comprising of 79 independent living units, 10 hostel beds, a 5 bed residential care facility, ancillary communal facilities, and parking.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
6 submissions: 6 from the public
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
52 documents in 6 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
EIS41
- Appendix A - SEARs Requirements Table
- Appendix AA - BCA Report
- Appendix B - Statutory Compliance Table
- Appendix BB - Access Report
- Appendix C - Mitigation Measues Table
- Appendix CC - Estimated Development Cost Report (Public)
- Appendix D - Architectural Drawings
- Appendix DD - Embodied Emissions
- Appendix E - Architectural Design Report
- Appendix EE - Construction Traffic Management Plan
- Appendix F - Landscape Plans
- Appendix F - Landscape Report
- Appendix FF - Clause 4.6 Variation Request (Height)
- Appendix G - Survey
- Appendix GG - Structural Report
- Appendix H - Engagement Outcomes Report
- Appendix HH - Detailed Site Investigation
- Appendix I - Connecting with Country
- Appendix I - Connecting with Country ( Public Art)
- Appendix J - Visual Impact Assessment
- Appendix K - Traffic Impact Assessment
- Appendix L - Noise Vibration Impact Assessment
- Appendix M - Civil Plans
- Appendix M - Stormwater Management Plan
- Appendix N - Flood Emergency Response Plan
- Appendix N - Flood Risk Assessment
- Appendix O - Geotechnical Report
- Appendix P- Preliminary Site Investigation
- Appendix Q - Test of Significance
- Appendix Q- BDAR Waiver
- Appendix R - Arboricultural Report
- Appendix S - BASIX Documentation
- Appendix T - Ecologically Sustainable Development Report
- Appendix U - Waste Management Report
- Appendix V - Aboriginal Due Diligence - Redacted
- Appendix W - Historical Archaeological Assessment
- Appendix X - Bushfire Statement
- Appendix Y - Social Impact Assessment
- Appendix Z - Building Services Reports
- Appendix Z - Building Services Reports (1)
- Environmental Impact Statement
Response to Submissions1
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.