AI summary. Written from this project's page and its Bella Vista_Scoping Report_Early Works on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Early works for shop-top housing at 9-11 Mawson Avenue, Bella Vista
The proponent seeks consent for early works on a 7,000 m² site at 9-11 Mawson Avenue, Bella Vista, in The Hills Shire, about 30 m from the Bella Vista Metro Station entrance. The works are bulk earthworks for a future basement, stabilisation and retaining structures including shoring, piling and a cap beam, and infrastructure services coordination and deviation. They would prepare the site for a separate mixed-use project of about 900 dwellings. No capital investment is stated.
The proponent asked for the Secretary's environmental assessment requirements (SEARs) in a scoping report dated 3 Oct 2025. An environmental impact statement (EIS) was exhibited and the proponent then responded to submissions. The 8 submissions were 3 objecting, 2 supporting and 3 commenting. The department is assessing the application, with advice from agencies. Next, the department prepares its assessment report and the application is determined.
- Site area
- 7,000 m²Bella Vista_Scoping Report_Early Works
- Dwellings in the later mixed-use project
- 900 dwellingsBella Vista_Scoping Report_Early Works
- Public submissions
- 8 submissionsPortal page
The department's description
Early works including bulk earthworks, excavation and retaining structures, and infrastructure services coordination.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
8 submissions: 5 from the public, 1 from organisations and 2 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
59 documents in 6 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
EIS35
- Appendix A - SEARs Compliance Table
- Appendix AA - CEMP
- Appendix B - Statutory Compliance Table
- Appendix BB - Social Impact Assessment (SIA)
- Appendix C - Community Engagement Table
- Appendix CC - Flood Impact Assessment
- Appendix D - Ongoing Mitigation Measures
- Appendix DD - Aboriginal Cultural Due Diligence Report
- Appendix E1 - EDC Report Part 1
- Appendix EE - Infrastructure Plan
- Appendix F - Engagement Report
- Appendix G - Site Plan
- Appendix H - Civil Engineering Drawings
- Appendix I - Structural Statement
- Appendix J - Structural Drawings
- Appendix K - Survey Plan
- Appendix L - Construction Traffic Management Plan
- Appendix M - Rail Interface and Impact Assessment
- Appendix N - Electrolysis Report
- Appendix O - Noise and Vibration Impact Assessment
- Appendix P - Integrated Stormwater Management Plan
- Appendix Q - Geotechnical Investigation
- Appendix R - Groundwater Impact Assessment
- Appendix S - Salinity Assessment
- Appendix T - PASSA
- Appendix U - Preliminary Site Investigation
- Appendix V - Detailed Site Investigation
- Appendix W - Arboricultural Impact Assessment
- Appendix X - BDAR Wavier Request
- Appendix Y - BDAR Wavier
- Appendix Z - CDWMP
- Envrionmental Impact Assessment_Early Works
- Nabers Embodied Emissions Materials
- Registered DP1252968 Plan
- Site Map
Response to Submissions9
- Appendix A - Submissions Register
- Appendix B - Amended Noise and Vibration Impact Assessment
- Appendix C - Detail Survey Plan
- Appendix D - Electrolysis Risk Assessment Report
- Appendix E - Geotechnical Numerical Analysis
- Appendix F - Metro Impact Assessment
- Appendix G - Updated Groundwater Inflow Modelling
- Response to Submissions and Amendments Report
- \RTS Letter - 9-11 Mawson Av Bella Vista - Early Works SSD
Agency Advice11
- Blacktown Council Letter
- CPHR REesponse_Bella Vista Shop-Top Housing HDA
- DCCEEW Water - Bella Vista Shop-Top Housing HDA
- Jemena - SSD-96580210
- SWC Response - SSD-96580210 - 9-11 Mawson Ave
- Sydney Metro RFI - SSD-96580210
- Sydney Metro RFI Review - SSD-96580210
- Sydney Metro RFI Review Register - SSD-96580210
- Sydney Water DA Information Sheet
- TfNSW Response SYD26-00564-01
- The Hills Shire Council Response SSDA Early Works 9-11 Mawson Ave(SSD-96580210)
What's near it
Where it is
- Suburb
- Bella Vista
- Council area
- The Hills Shire
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.