Shop Top Housing - 20-22 Atchison Street
40-storey shop top housing tower at 20-22 Atchison Street, St Leonards
Where it is in the process
Approved on 22 Jun 2026
What it proposes
AI summary. Written from this project's page and its Assessment Report and Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
40-storey shop top housing tower at 20-22 Atchison Street, St Leonards
The project is a 40-storey shop top housing building at 20-22 Atchison Street, St Leonards, in the North Sydney Council area. It has 181 apartments above a four-storey podium of commercial and residential uses, with five levels of basement parking for 87 car spaces. The building is 139 m high on a site of 1374 m². The estimated development cost is $177,640,178, with about 145 construction jobs and 93 full-time equivalent operational jobs.
The department exhibited it twice, from 2 Dec 2025 to 15 Dec 2025 and from 14 May 2026 to 28 May 2026. It received 21 submissions: 16 objecting, 2 supporting and 3 commenting. The proponent responded twice and made minor refinements. The department recommended approval, and its Executive Director approved it as the Minister's delegate on 22 Jun 2026, with conditions. Next, the proponent must meet those conditions before and during construction.
- Estimated development cost
- $177.6MAssessment Report
- Residential apartments
- 181 dwellingsAssessment Report
- Building height
- 139 mAssessment Report
- Building storeys
- 40 storeysAssessment Report
- Construction jobs
- 145 jobsAssessment Report
- Operational jobs
- 93 jobsAssessment Report
- Car parking spaces
- 87 car spacesAssessment Report
- Site area
- 1,374 m²Assessment Report
The department's description
Demolition of existing structures and construction of a 40-storey mixed-use development comprising a commercial and retail podium and 36 levels of residential apartments (market).
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
21 submissions: 18 from the public, 2 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
70 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition2
Request for SEARs1
EIS34
- Appendix A - SEARS Compliance Table
- Appendix AA - Clause 4.6 Variation Request
- Appendix BB – Geotechnical Report – 20-22 Atchison Street
- Appendix C - Statutory Compliance Table
- Appendix CC – Groundwater Impact Assessment
- Appendix D - Engagement Table
- Appendix DD – BCA Report – 20-22 Atchison Street
- Appendix E - Mitigation Measures
- Appendix F - Architectural Plans
- Appendix FF – Survey Plan – 20-22 Atchison Street
- Appendix G - Design Report ADG Compliance Assessment
- Appendix G - Schedule 9 Housing SEPP Assessment
- Appendix G - Urban Design Report
- Appendix GG – BDAR Waiver – 20-22 Atchison Street
- Appendix H - Landscape Design Report
- Appendix I – Engagement Report – 20-22 Atchison Street
- Appendix J – Pedestrian Wind Study – 20-22 Atchison Street
- Appendix K – Traffic Impact Assessment
- Appendix L – Noise and Vibration Impact Assessment
- Appendix M – Integrated Water Management Plan
- Appendix N – Detailed Site (Contamination) Investigation
- Appendix O – Arboricultural Impact Assessment
- Appendix P – ESD Report
- Appendix Q – NatHERS and BASIX Report
- Appendix R - Emboddied Emissions Form
- Appendix S – Waste Management Plan – 20-22 Atchison Street
- Appendix T – Social Impact Assessment
- Appendix U – Aboriginal Objects Due Diligence Assessment
- Appendix V – Preliminary Historical Archaeological
- Appendix W – Aviation Impact Assessment
- Appendix X – Accessibility Report – 20-22 Atchison Street
- Appendix Y – Preliminary Metro Impact Statement
- Appendix Z – Economic Impact Statement
- Environmental Impact Statement - 20-22 Atchison Street
Response to Submissions17
- Appendix A - Community Submissions Register
- Appendix B - Mitigation Measures
- Appendix C - Architectural Plans
- Appendix D - Wind Report
- Appendix E - Metro Impact Assessment
- Appendix F - Electrolysis Report
- Appendix G - Noise and Vibration Impact Assessment
- Appendix H - Reflected Glare Report
- Appendix I - Response to Comment on Landscaping Opportunity
- Appendix J - Waste Management Plan
- Appendix K - Clause 4.6 Request
- Appendix L - Urban Design Report
- Appendix M - Landscape Plans
- Appendix N - Survey Plan
- Request RTS Letter
- Submissions Report
- Supplementary Response to Submissions
Agency Advice10
What's near it
Where it is
- Suburb
- St Leonards
- Council area
- North Sydney
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.