Shoalhaven Starches Expansion
Where it is in the process
Approved on 28 Jan 2009
What it proposes
The department's description
Shoalhaven Starches
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Modifications
35 changes to the project after its decision, each assessed as a case of its own, newest first.
Shoalhaven Starches Mod 36 Dryer constructionMP06_0228-Mod-36
Shoalhaven Starches is seeking approval for an extension to ring dryer 9 and the speciality products building (RD9).
Modification 35 Proposed Increase to Ethanol Production VolumeMP06_0228-Mod-35
Shoalhaven Starches seek approval to modify their Project Approval for the Shoalhaven Starches Expansion Project to increase their approved ethanol production volume from the present 300 ML per annum to 400 ML per annum
Its 13 documents
13 documents in 2 folders, each on the NSW Planning Portal
Notice of Exhibition1
Modification Application12
Modification 32 Raw Material and Finished Product WarehouseMP06_0228-Mod-32
Construction and operation of a warehouse for the storage of raw materials for site processing and finished goods at the former Paper Mill site of the Shoalhaven Starches facility.
Its 1 documents
1 document in 1 folder, each on the NSW Planning Portal
Early Consultation1
Starches Distillery Heat Recovery & Gantry - MOD 31MP06_0228-Mod-31
Heat recovery upgrades including a Beverage Grade Ethanol Distillery Heat Recovery, Fuel Grade Ethanol Reconfiguration and Heat Recovery and Dried Distillers Grain Heat Recovery.
Its 50 documents
50 documents in 7 folders, each on the NSW Planning Portal
Early Consultation10
Modification Application23
Exhibition1
Response to Submissions6
Agency Advice5
Additional Information2
Shoalhaven Starches Expansion Project Mod 26MP06_0228-Mod-26
Installation of six wheat silos, construction of a truck and train unloading facility, container inverter, services and grain conveyor gantry, container storage area, weighbridge, maintenance workshop and electricity substation.
Its 38 documents
38 documents in 4 folders, each on the NSW Planning Portal
Modification Application17
Response to Submissions2
Agency Advice11
Additional Information8
Mod 34 - Proposed Grain Storage ShedMP06_0228-Mod-34
Proposed Grain Storage Shed to replace existing approved temporary grain bunker (mod 28)
Its 24 documents
24 documents in 5 folders, each on the NSW Planning Portal
Modification Application13
Agency Advice3
Additional Information5
Determination2
Consolidated Consent1
Installation of Heat Recovery Equipment Mod 33MP06_0228-Mod-33
Installation of heat recovery equipment for DDG Dryers 4 and 5 Mod 33
Its 20 documents
20 documents in 5 folders, each on the NSW Planning Portal
Modification Application5
Agency Advice4
Additional Information8
Determination2
Consolidated Consent1
Shoalhaven Starches MOD 30 - AdditionsMP06_0228-Mod-30
Alterations and additions to Supagas CO2 Plant including additional plant and equipment and amendments to facility footprint.
Its 33 documents
33 documents in 5 folders, each on the NSW Planning Portal
Modification Application13
Agency Advice6
Additional Information11
Determination2
Consolidated Consent1
Shoalhaven Starches MOD 25 - Rail LineMP06_0228-Mod-25
Extension of existing rail line by 1280 m including a 850 m train reverse loop and 180 m rail maintenance spur; and the addition of a roof baghouse to Product Dryer 3 & 4.
Its 43 documents
43 documents in 6 folders, each on the NSW Planning Portal
Notice of Exhibition1
Modification Application18
Response to Submissions4
Agency Advice11
Additional Information6
Determination3
Shoalhaven Starches MOD 29 - EvaporatorsMP06_0228-Mod-29
Additional MVR evaporator and relocation of approved cooling towers; additional stillage evaporators and associated equipment; re-configuration of the approved biofilter's; substations and switchroom.
Its 21 documents
21 documents in 5 folders, each on the NSW Planning Portal
Modification Application9
Agency Advice6
Additional Information3
Determination2
Consolidated Consent1
Shoalhaven Starches MOD 28 - Emergency StorageMP06_0228-Mod-28
Establishment of a temporary emergency grain storage with a capacity of 30,000 tonnes of grain within the Shoalhaven Starches Environmental Farm.
Its 19 documents
19 documents in 5 folders, each on the NSW Planning Portal
Modification Application9
Agency Advice3
Additional Information4
Determination2
Consolidated Consent1
Shoalhaven Starches MOD 27 - Buffer Tank ChangesMP06_0228-Mod-27
Amendments to approved Raw Waste Water Buffer Tank including increased size and the use of a Equalisation Tank.
Its 6 documents
6 documents in 2 folders, each on the NSW Planning Portal
Modification Application4
Determination2
Shoalhaven Starches MOD 21 - Packing PlantMP06_0228-Mod-21
Modifications to Packing Plant including the formulation of existing silo storage into 16 smaller storage silos and ancillary additions, installation of raw waste water tank, nitrogen generator and storage tanks, and an Indirect Cooking Facility.
Its 30 documents
30 documents in 5 folders, each on the NSW Planning Portal
Modification Application9
Agency Advice5
Additional Information13
Determination2
Consolidated Consent1
Shoalhaven Starches MOD 23 - Gas Fired PlantMP06_0228-Mod-23
Construction and operation of a gas-fired co-generation plant including two natural gas turbines with a total power output of 60 MW.
Its 31 documents
31 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
Modification Application10
Response to Submissions7
Agency Advice6
Additional Information3
Determination3
Consolidated Consent1
Shoalhaven Starches MOD 24 - Gluten Dryer 8MP06_0228-Mod-24
Amendments to the approved Gluten Dryer 8 (GD8) including an increase in building footprint, increase in building height, re-siting of the GD8 and the relocation of site infrastructure to accommodate changes to the GD8.
Its 10 documents
10 documents in 3 folders, each on the NSW Planning Portal
Modification Application7
Determination2
Consolidated Consent1
Shoalhaven Starches MOD 20 - CO2 PlantMP06_0228-Mod-20
Amendment to the Supagas C02 Plant for the installation of two additional liquid CO2 storage vessels and associated plant and construction works.
Its 11 documents
11 documents in 3 folders, each on the NSW Planning Portal
Modification Application8
Determination2
Consolidated Consent1
Shoalhaven Starches MOD 19 - Distillery UpgradeMP06_0228-Mod-19
Increase in production of beverage grade ethanol production from 110 mega litres to 210 mega litres including the construction of a new distillery, three ethanol storage tanks and associated site infrastructure.
Its 34 documents
34 documents in 4 folders, each on the NSW Planning Portal
Modification Application10
Agency Advice7
Additional Information15
Determination2
Shoalhaven Starches MOD 17 - Layout ChangesMP06_0228-Mod-17
The Modification includes: - relocation of baghouse for starch dryer no.5 - installation of service lifts for starch dryer no.5 - elevation of service conduit to packing plant - use of woodchips as boilers 2 and 4 fuel - modify condition 14J(e)
Its 26 documents
26 documents in 5 folders, each on the NSW Planning Portal
Modification Application8
Agency Advice3
Additional Information10
Recommendation3
Determination2
Shoalhaven Starches MOD 18 - Sanitiser ProductionMP06_0228-Mod-18
Proposed relocation of approved gas fired boiler to facilitate the production of hand sanitiser grade ethanol in response to supply demand due to COVID-19 pandemic including extension of existing gantry, new storage silo and storage shed.
Its 15 documents
15 documents in 4 folders, each on the NSW Planning Portal
Modification Application8
Agency Advice2
Recommendation3
Determination2
Shoalhaven Starches MOD 16 - Gluten DryerMP06_0228-Mod-16
/
Its 30 documents
30 documents in 5 folders, each on the NSW Planning Portal
Submissions7
Response to Submissions3
Recommendation2
Determination2
Shoalhaven Starches MOD 15 - CO2 PlantMP06_0228-Mod-15
/
Its 22 documents
22 documents in 6 folders, each on the NSW Planning Portal
Application1
Submissions5
Response to Submissions1
Recommendation2
Determination2
Shoalhaven Starches MOD 14 - Papermill ExpansionMP06_0228-Mod-14
/
Its 18 documents
18 documents in 5 folders, each on the NSW Planning Portal
Submissions5
Response to Submissions1
Recommendation2
Determination2
Shoalhaven Starches MOD 13 - BoilersMP06_0228-Mod-13
/
Its 27 documents
27 documents in 4 folders, each on the NSW Planning Portal
Application18
Submissions5
Response to Submissions1
Determination3
Shoalhaven Starches MOD 12 - Beverage EthanolMP06_0228-Mod-12
/
Its 26 documents
26 documents in 5 folders, each on the NSW Planning Portal
Application3
Submissions5
Response to Submissions5
Determination2
Shoalhaven Starches MOD 11 - DDGS DryersMP06_0228-Mod-11
/
Its 21 documents
21 documents in 5 folders, each on the NSW Planning Portal
Application8
Submissions4
Response to Submissions5
Determination2
Shoalhaven Starches MOD 10 - Flour Mill BMP06_0228-Mod-10
/
Its 14 documents
14 documents in 3 folders, each on the NSW Planning Portal
Recommendation1
Determination1
Shoalhaven Starches MOD 9 - Packing PlantMP06_0228-Mod-9
/
Its 28 documents
28 documents in 6 folders, each on the NSW Planning Portal
Application8
Submissions7
Response to Submissions3
Recommendation2
Determination1
Shoalhaven Starches MOD 8 - Flour MillMP06_0228-Mod-8
/
Its 11 documents
11 documents in 4 folders, each on the NSW Planning Portal
Application3
Submissions2
Determination3
Shoalhaven Starches MOD 7 - Starch DryerMP06_0228-Mod-7
/
Its 14 documents
14 documents in 4 folders, each on the NSW Planning Portal
Application5
Submissions3
Determination2
Shoalhaven Starches MOD 6 - DemolitionMP06_0228-Mod-6
/
Its 7 documents
7 documents in 4 folders, each on the NSW Planning Portal
Application1
Recommendation2
Determination3
Shoalhaven Starches MOD 5 - DDGS Pelletising PlantMP06_0228-Mod-5
/
Its 2 documents
2 documents in 2 folders, each on the NSW Planning Portal
Application1
Recommendation1
Mod 4MP06_0228-Mod-4
Its 8 documents
8 documents in 4 folders, each on the NSW Planning Portal
Application2
Submissions2
Recommendation2
Determination2
Mod 3 - Carpark RelocationMP06_0228-Mod-3
Its 10 documents
10 documents in 4 folders, each on the NSW Planning Portal
Application2
Submissions2
Response to Submissions3
Assessment3
Mod 2 - Fermentation Tanks and Distillation ColumnsMP06_0228-Mod-2
Its 12 documents
12 documents in 7 folders, each on the NSW Planning Portal
Request for DGRS1
Application2
Submissions2
Response to Submissions1
Recommendation3
Determination2
Mod 1 - Amendment to Odour ControlsMP06_0228-Mod-1
Its 22 documents
22 documents in 3 folders, each on the NSW Planning Portal
Request for DGRS1
Determination17
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
116 documents in 8 folders, each on the NSW Planning Portal
Application2
Response to Submissions3
Determination3
Management Plans and Strategies50
Independent Reviews and Audits12
Other Documents19
What's near it
Its point is approximate (the register's own, to about a kilometre), and so are these.
Where it is
- Suburb
- Bomaderry
- Council area
- Shoalhaven
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.