On the map
State significant development

Rutherford Waste Facility

Decided: approved on 4 Jul 2006Waste

Where it is in the process

Approved on 4 Jul 2006

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination4 Jul 2006 (done)
  8. Approved4 Jul 2006

What it proposes

The portal gives no description.

Modifications

8 changes to the project after its decision, each assessed as a case of its own, newest first.

Mod 3 - Relocate Oil TanksMP05_0037-Mod-3

Withdrawn: withdrawn

Its page on the Planning Portal

Rutherford Waste Facility MOD 8 - Evaporation UnitMP05_0037-Mod-8

Decided: approved on 12 Nov 2026 by the department (team leader)

Installation of an evaporation unit within a new dedicated shed for onsite treatement of wastewater.

Its 29 documents

29 documents in 4 folders, each on the NSW Planning Portal

Modification Application12

See the 12 documents on the Planning Portal

Agency Advice5

See the 5 documents on the Planning Portal

Additional Information10

See the 10 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Rutherford Waste Facility MOD 7 - Waste Gas StackMP05_0037-Mod-7

Decided: approved on 11 Oct 2023 by the department (team leader)

Construct an additional waste gas stack to separate emission flow from the existing stack into two distinct emission points.

Its 11 documents

11 documents in 4 folders, each on the NSW Planning Portal

Modification Application6

See the 6 documents on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Rutherford Waste Facility MOD 6 - Oil Polishing PlantMP05_0037-Mod-6

Decided: approved on 20 Aug 2021 by the department (director)

Installation and Operation of a Mobile Oil Polishing Plant

Its 10 documents

10 documents in 4 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Additional Information6

See the 6 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Mod 5 - Install Additional PlantMP05_0037-Mod-5

Decided: approved on 9 Sep 2016 by the department (executive director) · 2 submissions

Its 22 documents

Its page on the Planning Portal

Rutherford Waste Facility MOD 4 - Replace StockMP05_0037-Mod-4

Decided: approved on 10 Dec 2014 by Dir(Metro/Reg-N)

/

Its 5 documents

5 documents in 2 folders, each on the NSW Planning Portal

EA3

See the 3 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 2 - Monitoring RequirementsMP05_0037-Mod-2

Decided: approved on 18 Oct 2011 by the department (deputy director-general)

Its 11 documents

11 documents in 3 folders, each on the NSW Planning Portal

Application2

See the 2 documents on the Planning Portal

EA7

See the 7 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 1 - Condition ChangesMP05_0037-Mod-1

Decided: approved on 16 May 2007 by the Minister

Its 1 documents

1 document in 1 folder, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.