State significant development

Rockley Falls Quarry

A hard rock quarry at Rockley Falls, near Holbrook

Decided: approved on 16 Jun 2008QuarriesNeighbourhood scale

Where it is in the process

Approved on 16 Jun 2008

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination16 Jun 2008 (done)
  8. Approved16 Jun 2008

What it proposes

AI summary. Written from this project's page and its Approval.pdf and DG's Assessment Report.pdf on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A hard rock quarry at Rockley Falls, near Holbrook

The project is a hard rock quarry on the Rockley Falls property, about four kilometres north east of Holbrook, in the Greater Hume Shire. It would produce up to 700,000 tonnes a year for the first four years, to supply the Hume Highway duplication, then up to 100,000 tonnes a year for the remaining 16 years of a 20-year life. The site covers about 17 ha, of which 10 ha would be quarried, with a 2.3 kilometre access road. A six-metre-high acoustic barrier would reduce noise, and more than 243 ha would be set aside as an offset. No capital investment is stated.

The environmental assessment was exhibited from 3 Mar 2008 to 4 Apr 2008. The department received five submissions, all from public authorities, and none objected. Its assessment report of May 2008 recommended approval with conditions. The Minister approved the project on 16 Jun 2008. Next, the operator must meet the conditions on noise, monitoring and rehabilitation.

Peak annual output (first four years)
700,000 tonnes a yearDG's Assessment Report.pdf
Annual output (final 16 years)
100,000 tonnes a yearDG's Assessment Report.pdf
Site area
17 haDG's Assessment Report.pdf
Area to be quarried
10 haDG's Assessment Report.pdf
Access road length
2.3 kilometresDG's Assessment Report.pdf
Offset area
243 haDG's Assessment Report.pdf
Outbound trucks a day (first four years)
85 trucksDG's Assessment Report.pdf
Public submissions
0 submissionsPortal page

The department's description

Rockley Falls Quarry

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Modifications

7 changes to the project after its decision, each assessed as a case of its own, newest first.

Mod 7 - 24 Hour Concrete ProductionMP07_0078-Mod-7

Decided: approved on 21 Feb 2013 by Dir(MDA)

Its 4 documents

4 documents in 2 folders, each on the NSW Planning Portal

Uncategorised2

See the 2 documents on the Planning Portal

Application2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 6 - Extend OperationsMP07_0078-Mod-6

Decided: approved on 6 Feb 2012 by Dir(MDA)

Its 4 documents

4 documents in 2 folders, each on the NSW Planning Portal

EA3

See the 3 documents on the Planning Portal

Determination1

See the document on the Planning Portal

Its page on the Planning Portal

Mod 5 - Wet Batch Plant and Operating HoursMP07_0078-Mod-5

Decided: approved on 6 Apr 2011 by the department (director-general)

Its 6 documents

Its page on the Planning Portal

Mod 4 - Vegetation Offset AreasMP07_0078-Mod-4

Decided: approved on 24 May 2010 by Dir(MDA)

Its 5 documents

5 documents in 3 folders, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

EA1

See the document on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Mod 3 - Dry-Mix Batch PlantMP07_0078-Mod-3

Decided: approved on 24 May 2010 by Dir(MDA)

Its 4 documents

4 documents in 2 folders, each on the NSW Planning Portal

EA1

See the document on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Its page on the Planning Portal

Mod 2 - Extend Stockpile AreaMP07_0078-Mod-2

Decided: approved on 16 Nov 2009 by the department (deputy director-general)

Its 4 documents

4 documents in 3 folders, each on the NSW Planning Portal

Application1

See the document on the Planning Portal

EA1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Mod 1 - Sediment BasinMP07_0078-Mod-1

Decided: approved on 19 Jun 2009 by the department (deputy director-general)

Its 3 documents

3 documents in 2 folders, each on the NSW Planning Portal

EA1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.