On the map
Site verification certificate

Rix's Creek North Continuation Project

Continuing the Rix's Creek North mine to 2049, Singleton

Under way: under wayOtherDistrict scale

Where it is in the process

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)

What it proposes

AI summary. Written from this project's page on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Continuing the Rix's Creek North mine to 2049, Singleton

The case concerns a proposal to continue mining operations at the Rix's Creek North Mine until 2049. The mine is on Bridgman Road, Singleton, in the Singleton Shire. No capital investment, production rate, area or number of jobs is stated.

The case is recorded as a Site Verification Certificate, and no stage or date is given. A site verification certificate is an early step in which the department confirms whether land is suitable for a particular use. No submissions have been recorded. No documents are listed. The next steps for a State significant project are usually a request for the Secretary's environmental assessment requirements (SEARs) and an environmental impact statement (EIS), which would be exhibited for public submissions before the department assesses it.

The department's description

Continuation of mining operations at the Rix's Creek North Mine until 2049

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.