On the map
State significant development

River Road West Build-to-Rent

A build-to-rent housing project at River Road West, Parramatta

Under way: at sears expiredHomesNeighbourhood scale

Where it is in the process

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)

What it proposes

AI summary. Written from this project's page and its SSD SEARs Industry Specific Cover Letter on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A build-to-rent housing project at River Road West, Parramatta

The proponent proposes a build-to-rent housing development at 10-12 River Road West, Parramatta, in the City of Parramatta. The amended proposal is 100% build-to-rent, with 15% affordable housing, using the Housing SEPP's height and floor space bonuses. No number of dwellings, building height or capital investment is stated.

The department issued the Secretary's environmental assessment requirements (SEARs) on 6 Jun 2024. They set out what the environmental impact statement (EIS) must cover, including a flood emergency response plan and consultation with the State Emergency Service. The SEARs have expired, and no EIS has been lodged, so there has been no exhibition and no submissions. A new SEARs application would be needed for the project to go ahead.

Affordable housing share
15%SSD SEARs Industry Specific Cover Letter

The portal gives no description.

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

2 documents in 1 folder, each on the NSW Planning Portal

SEARs2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.