Residential flat building with in-fill affordable housing - 93 Bridge Road, Westmead
549 homes in two towers at 93 Bridge Road, Westmead
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
549 homes in two towers at 93 Bridge Road, Westmead
The proponent proposes to demolish the existing buildings at 93 Bridge Road, Westmead, in the City of Parramatta, and build two residential towers with 549 dwellings, including 80 affordable dwellings. The development would also include a 1,000 m² public park, landscaping and public domain works. The environmental impact statement (EIS) says the affordable homes would be managed by a community housing provider for at least 15 years. No capital investment figure is stated.
The EIS is dated 19 May 2025. It drew 17 submissions: 13 objecting and 4 commenting. The proponent has responded to submissions, and the department has asked for more information. Next, the department continues its assessment with advice from other agencies. The Minister or a delegate decides the application. No decision date is set.
- Dwellings
- 549 dwellingsEnvironmental Impact Statement
- Affordable dwellings
- 80 dwellingsEnvironmental Impact Statement
- Public park area
- 1,000 m²Environmental Impact Statement
- Minimum affordable housing period
- 15 yearsEnvironmental Impact Statement
- Submissions
- 17 submissionsPortal page
- Submissions objecting
- 13 submissionsPortal page
The department's description
Demolition, construction of residential flat buildings with in-fill affordable housing and a public park, and associated works
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
17 submissions: 13 from the public, 3 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
81 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
Early Consultation1
Request for SEARs2
EIS41
- Appendix A - SEARs Table
- Appendix AA Geotechnical Assessment
- Appendix B - Statutory Compliance Table
- Appendix BB Stormwater Management Plan
- Appendix C - Mitigation Measures
- Appendix CC Preliminary Site Investigation
- Appendix D - Community Consultation Table
- Appendix DD Construction Waste Management Plan
- Appendix E - Community Housing Provider Letter
- Appendix EE - Operational Waste Management Plan
- Appendix FF Aboriginal Cultural Heritage Due Diligence
- Appendix G - Architectural Plans
- Appendix GG - Social Impact Assessment
- Appendix H - Survey Plans
- Appendix HH - Engagement Report
- Appendix I - Design Report
- Appendix II - CPTED Report
- Appendix J - Design Verification Statement
- Appendix JJ - Construction Management Plan
- Appendix K - Landscape Plan
- Appendix KK - Services Infrastructure Report
- Appendix L - Landscape Report
- Appendix LL - Estimated Development Cost Report
- Appendix M Connecting with Country Report
- Appendix N BCA Report
- Appendix O - BASIX Certificate
- Appendix P ESD Report
- Appendix Q - NatHERS Certificate
- Appendix R Visual Impact Assessment
- Appendix S BDAR Waiver
- Appendix T Arboricultural Impact Assessment
- Appendix U Solar Reflectivity Report
- Appendix V - Pedestrian Wind Assessment
- Appendix W - Transport Impact Assessment
- Appendix X Noise and Vibration Impact Assessment
- Appendix Y Civil Engineering Plan
- Appendix Z Preliminary Historical Heritage Assessment
- Application_20250521071326
- EIS Executive Summary
- Environmental Impact Statement
- GIS DATA
Response to Submissions27
- Appendix A - Submission Register
- Appendix B - Architectural Plans
- Appendix C - Amended Design Report
- Appendix D - CPTED Report
- Appendix E - Landscape Plans
- Appendix F - Landscape Report
- Appendix G - Survey
- Appendix H - Addendum Transport Letter
- Appendix I - Pedestrian Wind Tunnel Modelling
- Appendix J - Natural Ventilation Letter
- Appendix K - Detailed Site Investigation
- Appendix L - Geotechnical Report
- Appendix M - Hydrogeological Report
- Appendix N - Water feasibility letter
- Appendix O - Amended Civil Plans
- Appendix P - Amended Stormwater Management Plan
- Appendix P(1) - MUSIC modelling
- Appendix Q - DRAINS modelling
- Appendix R - Vertical Transport Letter
- Appendix S - Design Verification Statement
- Appendix T - Aviation Impact Assessment
- Appendix U - Unit Mix Analysis
- Appendix V - Infrastructure Assessment Report
- Appendix W - CHP Letter
- Appendix X- Addendum Acoustic Letter
- Request RTS Letter
- Response to Submissions Report
What's near it
Where it is
- Suburb
- Westmead
- Council area
- Parramatta
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.