Residential development with in-fill affordable housing at 65 Muston Street, Mosman
A residential flat building with 4 affordable homes, Mosman
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its Environmental Impact Statement on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A residential flat building with 4 affordable homes, Mosman
The proponent proposes a residential flat building with in-fill affordable housing at 65 Muston Street, Mosman, in the Mosman Municipality. The portal describes it as including 4 affordable apartments. No total number of dwellings, building height or capital investment is stated.
The Secretary's environmental assessment requirements (SEARs) were issued on 12 Nov 2025 and the environmental impact statement (EIS) is dated March 2026. The proponent has since responded to submissions and amended the application. The case page shows 301 submissions: 296 objecting, 4 supporting and 1 commenting. The stage is now "More Information Required". Next, the department continues its assessment and decides the application.
- Affordable apartments
- 4 dwellingsPortal page
- Public submissions
- 301 submissionsPortal page
- Submissions objecting
- 296 submissionsPortal page
The department's description
Residential flat building with in-fill affordable housing (including 4 affordable apartments)
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
301 submissions: 295 from the public, 5 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
83 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Early Consultation1
Request for SEARs3
SEARs2
EIS38
- Appendix 1 - SEARs
- Appendix 10 - Acoustic Impact Assessment
- Appendix 11 - Noise and Vibration Management Plan
- Appendix 12 - Geotechnical Investigation
- Appendix 13 - Groundwater Impact Assessment
- Appendix 14 - Preliminary Site Investigation
- Appendix 15 - Landscape Plans
- Appendix 16A - BASIX Certificate
- Appendix 16B - Summary NatHERS Certificate
- Appendix 17 - ESD Report
- Appendix 18A - BDAR Waiver
- Appendix 18B - BDAR Waiver Application
- Appendix 19 - Construction and Demolition Waste Management Plan
- Appendix 2 - Community Housing Provider - Letter of Support
- Appendix 20 - Operational Waste Management Plan
- Appendix 21 - Aboriginal Cultural Heritage Advice
- Appendix 22 - Flood Impact and Risk Assessment
- Appendix 23A - Integrated Water Management Plan
- Appendix 23B - Stormwater Management Drawings
- Appendix 24 - Heritage Impact Assessment
- Appendix 25 - AIA with Preliminary TPM
- Appendix 26 - BCA Report and Access Report
- Appendix 27 - Adaptable Housing and LHDG Report
- Appendix 28 - Statutory Compliance Table
- Appendix 29A - Clause 4.6-Building Height
- Appendix 29B - Clause 4.6-Wall Height
- Appendix 3 - Community Engagement Outcomes Report
- Appendix 30 - Estimated Development Cost
- Appendix 4 - Architect Design Report
- Appendix 5 - Architectural Drawings
- Appendix 6A - Survey Plan
- Appendix 6B - Travel Distance Survey
- Appendix 7A - Visual Impact Assessment
- Appendix 7B - Visual Impact Assessment Appendix A
- Appendix 8 - Construction Traffic and Pedestrian MP
- Appendix 9 - Transport Impact Assessment
- Application_20260317042901
- Environmental Impact Statement
Response to Submissions32
- Appendix 1 Amendment Report
- Appendix 10 Heritage Impact Response
- Appendix 11A Amended Geotechnical Investigation
- Appendix 11B Geotechnical Response
- Appendix 12A Amended BASIX Certificate
- Appendix 12B Amended NatHETS Summary
- Appendix 13 ESD Report
- Appendix 14 Amended OWMP
- Appendix 15 Amended Arorist Report
- Appendix 16 Amended BCA and Access Report
- Appendix 17 Amended Statutory Compliance Table
- Appendix 18A Clause 4.6-Building Height
- Appendix 18B Clause 4.6-Wall Height
- Appendix 19 Amended Mitigation Measures
- Appendix 2 Submissions Register
- Appendix 20A RICQS EDC Peer Review
- Appendix 20B QS Consideration
- Appendix 21 Link Wentworth Letter of Support
- Appendix 22 Amended Adaptable Housing and LHDG Report
- Appendix 3 Amended Architectural Drawings
- Appendix 4 Architectural Design Report
- Appendix 5 Amended Landscape Drawings
- Appendix 6A Amended IWMP
- Appendix 6B Amended Stormwater Drawings
- Appendix 6C Amended Flood Advice
- Appendix 6D Response re Stormwater Seepage
- Appendix 7 Walking Route Assessment
- Appendix 8A Amended Visual Impact Assessment
- Appendix 8B Amended Visual Impact Assessment Appendix A
- Appendix 9 Transport Impact Assessment Response
- Request RTS Letter
- Submissions Report
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.