A nine storey, 54 apartment building at Spencer Street, Rose Bay
Where it is in the process
Approved on 29 Jun 2026
What it proposes
AI summary. Written from this project's page and its SSD Assessment Report and SSD Instrument of Consent on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A nine storey, 54 apartment building at Spencer Street, Rose Bay
The project is a nine storey residential flat building at 2-16 Spencer Street, Rose Bay, in the Woollahra Municipality. It has 54 apartments, 13 of them affordable housing, over three levels of basement parking with 110 car spaces. Existing houses on the site would be demolished. The building would be 28.6 m high on a site of 2,787.5 m², and the estimated development cost is $87,073,000.
The environmental impact statement (EIS) was exhibited from November 2025 to December 2025 and drew 61 submissions: 60 objecting and 1 supporting. The proponent responded on 18 Mar 2026 and gave more information on 17 Apr 2026 and 21 May 2026, making design changes. The department's assessment recommended approval. The department's Executive Director, as the Minister's delegate, approved the project on 29 Jun 2026, with conditions. Next, the proponent must meet those conditions before construction.
- Estimated development cost
- $87.1MSSD Assessment Report
- Apartments
- 54 apartmentsSSD Instrument of Consent
- Affordable housing apartments
- 13 apartmentsSSD Instrument of Consent
- Car spaces
- 110 car spacesSSD Instrument of Consent
- Building height
- 28.6 mSSD Assessment Report
- Site area
- 2,787.5 m²SSD Assessment Report
The department's description
Demolition of existing buildings and construction of a residential apartment development, including affordable housing apartments, above basement car parking.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
61 submissions: 58 from the public and 3 from organisations
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
83 documents in 8 folders, each on the NSW Planning Portal
Early Consultation1
Notice of Exhibition1
SEARs1
EIS36
- Appendix A - SEARs Requirements Table
- Appendix AA - Heritage Impact Statement [Redacted]
- Appendix B - Architectural Plans
- Appendix BB - Social Impact Assessment
- Appendix C - Statutory Compliance Table
- Appendix CC- Engagement Outcomes Report
- Appendix D - Mitigation Measures Table
- Appendix DD - CHP Letter
- Appendix E - Survey Plan
- Appendix EE - Groundwater Impact Assessment
- Appendix F - EDC Report
- Appendix G - Architectural Design Report
- Appendix H - BCA and Access Report
- Appendix I - Wind Report
- Appendix J - Visual Impact Assessment
- Appendix J - Visual Impact Assessment (Appendix A)
- Appendix K - Arboricultural Impact Assessment
- Appendix L - Landscape Plans
- Appendix M - Landscape Design Report
- Appendix N - ESD Report
- Appendix O - Embodied Emmissions Report
- Appendix P - BASIX Certificate
- Appendix P - NatHERS Certificate
- Appendix Q - Traffic and Parking Assessment
- Appendix R - Acoustic Report
- Appendix S - BDAR Waiver
- Appendix T - Geotechnical Investigation
- Appendix U - Integrated Water Management Plan
- Appendix U - Stormwater Management Plans
- Appendix V - Flood Impact Assessment
- Appendix W - Preliminary Site Investigation
- Appendix X - Detailed Site Investigation
- Appendix Y - Waste Management Plan
- Appendix Z - ACHAR (Redacted)
- Application_20251023040722
- Environmental Impact Statement
Response to Submissions19
- Appendix A - Submissions Register
- Appendix B - Updated Architectural Plans
- Appendix C - Statutory Compliance Table
- Appendix D - Updated Architectural Design Report
- Appendix E - Geotech Hydrogeological Technical Memo
- Appendix F - Updated Acoustic Report
- Appendix G - Updated Landscape Plans
- Appendix H - Arborist Report
- Appendix I - Bus Timetables
- Appendix K - HNSW RTS Letter
- Appendix L - Historical Archaeology Letter
- Appendix M - Updated ACHAR [Redacted]
- Appendix N - Letter to RAPs
- Appendix O - Landscape Design Report
- BASIX - Spencer Street ROSE BAY NSW 2029
- NATHERS - Spencer Street ROSE BAY NSW 2029
- Request RTS Letter
- Response to Submissions Report
- Updated ESD Report
Agency Advice12
- Appendix B - Updated Architectural Plans V2
- Appendix C - Updated Landscape Plans
- Appendix D - Landscape Response
- Appendix E - CHP Response
- Council's comments on RtS
- DCCEEW Water- Residential dev Spencer St Rose Bay - RTS
- DCCEEW comments
- HNSW ACH - RFI - Infill Rose Bay - SSD-86122958
- HNSW ACH - RTS - Infill Rose Bay - SSD-86122958
- HNSW ACH comments
- Independent Geotehnical Review by PSM
- Response to Submissions 2 - 2-16 Spencer Street, Rose Bay
Additional Information9
- Appendix A - Updated ACHAR [Redacted]
- Appendix B - Updated Architectural Plans V3
- Appendix C - Updated Landscape Plans
- Appendix D - Landscape Response
- Appendix E - CHP Response
- Memo on Groundwater Drawdwon
- Response to Submissions 2 - 2-16 Spencer Street, Rose Bay
- Updated Waste Management Plan V2
- Updated architectural plans Rev F
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.