On the map
State significant infrastructure

Prospect Water Filtration Plant Upgrade

Withdrawn: withdrawnWater and sewerage

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

The department's description

To upgrade Prospect Water Filtration Plant (WFP) to improve its reliability to ensure that it continues to meet the revised Australian Drinking Water Guidelines requirements to protect the WFP from potential flooding events.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

2 documents in 2 folders, each on the NSW Planning Portal

Early Consultation1

See the document on the Planning Portal

SEARs1

See the document on the Planning Portal

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.