Project Maverick - Internal Works
14 warehouses and open space at Martin Road, Bradfield
Where it is in the process
At assessment
What it proposes
AI summary. Written from this project's page and its EIS - Project Maverick Internal Works on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
14 warehouses and open space at Martin Road, Bradfield
The proponent proposes to build, fit out and operate 14 warehouse buildings at 225-245 Martin Road, Bradfield, in the Liverpool City Council area. The warehouses would total about 597,610 m² of floor space on a developable site of about 112.4 ha, and would run 24 hours a day. They would be 14.6 m or 16.8 m high. The project also includes an active open space and amenities precinct with a café, internal roads and stormwater basins. No capital investment is stated.
The environmental impact statement (EIS) is dated 12 May 2026. It has drawn 5 submissions: 1 objecting, 1 supporting and 3 commenting. The proponent has responded to submissions, and the department asked for more information on 20 Oct 2026. Next, the department assesses the proponent's reply, with advice from other agencies. It then prepares an assessment report and the application is determined.
- Warehouse buildings
- 14 warehousesEIS - Project Maverick Internal Works
- Warehouse and office floor space
- 597,610 m²EIS - Project Maverick Internal Works
- Developable site area
- 112.4 haEIS - Project Maverick Internal Works
- Largest warehouse building height
- 16.8 mEIS - Project Maverick Internal Works
- Amenities precinct floor area
- 708 m²EIS - Project Maverick Internal Works
The department's description
Construction, fit-out and operation of 14 warehouses, active open space and amenities precinct, and internal estate infrastructure works.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
5 submissions: 2 from the public, 2 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
171 documents in 7 folders, each on the NSW Planning Portal
Notice of Exhibition1
SEARs5
EIS68
- Appendix AA - ESD Report
- Appendix AAA - Social Impact Assessment
- Appendix A_SEARs Requirements Table
- Appendix B - Aerotropolis Statutory Compliance Table_
- Appendix BB - EDC Report Part 1
- Appendix BBB - Survey Plan
- Appendix C - Aerotropolis DCP Compliance Table
- Appendix CC - Engagement Outcomes Report
- Appendix CCC - Transport Impact Assessment
- Appendix D - Mitigation Measures Table
- Appendix DD - Options and Base Testing Report
- Appendix DDD - Urban Design Report
- Appendix E - Clause 4.39 Variation Request
- Appendix EE - Fire Safety Strategy
- Appendix EEE - Vegetation Management Plan
- Appendix F - SDRP Response Table
- Appendix FF - Job Creation Report
- Appendix G - Design Excellence Strategy
- Appendix GG - Framework Travel Plan
- Appendix H - ACHAR (Redacted)
- Appendix HH - Groundwater Assessment Report
- Appendix I - Air Quality Impact Assessment
- Appendix II - Infrastructure Staging and Delivery Plan
- Appendix J - Arboricultural Report
- Appendix JJ - IWCMS
- Appendix K - WHAMP
- Appendix KK - LUCRA & Biosecurity Management Plan
- Appendix L - Architectural Design Report
- Appendix LL - Landscape Design Report
- Appendix M - Architectural Plans (Active Open Space)
- Appendix M - Architectural Plans (Estate)
- Appendix M - Architectural Plans (Lot 1-12)
- Appendix MM - Landscape Plans (Active Open Space)
- Appendix MM - Landscape Plans (Estate)
- Appendix MM - Landscape Plans (Lots 1-12)
- Appendix N - Aviation Impact Assessment
- Appendix NN - Flow Duration Curve Interim
- Appendix NN - Flow Duration Curve Ultimate
- Appendix NN - MUSIC Models
- Appendix O - BCA and Access Report
- Appendix OO - Agreement to Rate
- Appendix P - BDAR
- Appendix PP - Embodied Emmissions Materials Form
- Appendix Q - Bushfire Hazard Assessment
- Appendix QQ - Net Zero Statement
- Appendix R - Civil Engineering Plans (Estate)
- Appendix R - Civil Engineering Plans (Lots 1-12)
- Appendix R - Civil Engineering Plans (Open Space East)
- Appendix R - Civil Engineering Plans (Open Space West)
- Appendix RR - Noise and Vibration Impact Assessment
- Appendix S - Civil Engineering Report
- Appendix SS - Statement of Heritage Impact
- Appendix T - Connecting with Country Design Framework
- Appendix TT - Sydney Water Basin Design Plans
- Appendix U - CTMP
- Appendix UU - Cost Summary
- Appendix V - CPTED
- Appendix VV - Public Art Strategy
- Appendix W - Design Considerations & Themes Report
- Appendix WW - Recognise Country Template
- Appendix X - Design Statements (Traffic)
- Appendix XX - VIA
- Appendix Y - Contamination Cover Letter
- Appendix YY - SEPP Hazards and Resilience Report
- Appendix Z - Waste Management Plan
- Appendix ZZ - Smart Places Assessment Report
- Application_20260512075226
- EIS - Project Maverick Internal Works
Response to Submissions66
- Appendix A - Response to Submissions Table
- Appendix AA - Updated Statement of Heritage Impact
- Appendix B - Updated DCP Compliance Table
- Appendix BB - Updated Sydney Water Basin Design Plans
- Appendix C - Updated Mitigation Measures Table
- Appendix CC - Updated Cost Summary Report
- Appendix D - Updated Clause 4.39 Variation Request
- Appendix D1 - Updated Aero Stat Complaince Table
- Appendix DD - Updated Public Art Strategy
- Appendix E - Updated ACHAR (Redacted)
- Appendix E - Updated ACHAR Consultation Logs (Private)
- Appendix EE - Updated Survey Plan
- Appendix F - Updated Air Quality Impact Assessment
- Appendix FF - Updated CTMP
- Appendix FF - Updated Transport Impact Report
- Appendix G - Updated Arboricultural Report
- Appendix GG - Updated Urban Design Report (Addendum)
- Appendix H - Updated Architectural Design Report
- Appendix HH - Updated Vegetation Management Plan
- Appendix I - Updated Architectural Plans (AOS)
- Appendix I - Updated Architectural Plans (Estate)
- Appendix I - Updated Architectural Plans (Lot 1-12)
- Appendix II - Salinity Management Plan
- Appendix J - Updated BCA & Access Report
- Appendix JJ - Updated Embodied Emissions Materials Forms
- Appendix K - Updated BDAR
- Appendix KK - Urban Heat Island Analysis
- Appendix L - Updated Bushfire Hazard Assessment
- Appendix LL - Updated WHAMP
- Appendix M - Civil Engineering Plans (Estate)
- Appendix M - Civil Engineering Plans (Lots 1-12)
- Appendix M - Civil Engineering Plans (Open_Space_East)
- Appendix M - Civil Engineering Plans (Open_Space_West)
- Appendix MM - Addendum A - SSD DSI Addendum (Lot 54)
- Appendix MM - Addendum B - SSD 97711727 DSI
- Appendix MM - Addendum C - SSD 97711727 RAP
- Appendix MM - Updated Contamination Cover Letter
- Appendix N - Updated Civil Engineering Report
- Appendix NN - Agency Consultation Evidence
- Appendix O - Updated Traffic Design Statement (Amenity Lot)
- Appendix O - Updated Traffic Design Statements (Warehouses)
- Appendix OO - Boral Landowners Consent
- Appendix P - Updated EDC Report
- Appendix PP - Updated Aviation Impact Assessment
- Appendix Q - Updated Fire Safety Strategy
- Appendix QQ - Riparian Corridor Validation Letter
- Appendix R - Updated Framework Travel Plan
- Appendix RR - CNVMP
- Appendix S - Updated ISDP
- Appendix SS - Updated Groundwater Assessment Report
- Appendix T - Updated Integrated Water Managment Report
- Appendix TT - Flow Duration Curve Check - Interim
- Appendix TT - Flow Duration Curve Check - Ultimate
- Appendix U - Updated Land Conflict Management Plan
- Appendix UU - Updated Job Creation Report
- Appendix V - Updated Landscape Design Report
- Appendix VV - Updated DRAINS Models
- Appendix W - Updated Landscape Plans (Active_Open_Space)
- Appendix W - Updated Landscape Plans (Estate)
- Appendix W - Updated Landscape Plans (Lot 1-12)
- Appendix X - Updated Interim and Ultimate MUSIC Model
- Appendix Y - Updated Net Zero Statement
- Appendix Z - Updated Noise and Vibration Impact Assessment
- RTS Request - DPHI Issues Letter
- Request Submissions Report
- Response to Submissions Report - Project Maverick
Agency Advice24
- AirServices - Advice on RTS
- BDA - Advice on EIS
- CASA - Advice on EIS
- CPHR - Advice on EIS
- DCA Tech - Advice on RTS
- DCCEEW Water Group - Advice on EIS
- DPIRD (Ag) - Advice on EIS
- DPIRD (Fisheries) - Advice on EIS
- DPIRD - Advice on RTS
- FRNSW - Advice on EIS
- HNSW (ACH) - Advice on EIS
- Heritage NSW - Advice on EIS
- Jemena - Advice on EIS
- LCC (flooding) - Advice on EIS
- LCC - Advice on EIS
- Liverpool City Council - Advice on EIS
- MCEF - Advice on RTS
- RFS - Advice on EIS
- Sydney Water - Advice on EIS
- Sydney Water - Advice on EIS - Attachment 2
- TfNSW - Advice on EIS
- TfNSW - Advice on RTS
- WSI - Advice on RTS
- WSIA - Advice on EIS
What's near it
Where it is
- Suburb
- Badgerys Creek
- Council area
- Liverpool
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.