Princes Highway, Milton Ulladulla Bypass
A 12 km Princes Highway bypass of Milton and Ulladulla
Where it is in the process
At response to submissions
What it proposes
AI summary. Written from this project's page and its Milton Ulladulla bypass EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 12 km Princes Highway bypass of Milton and Ulladulla
Transport for NSW proposes to upgrade a section of the Princes Highway to create a 12 km bypass of the towns of Milton and Ulladulla, in the Shoalhaven City Council area. The bypass would run from just north of the Little Forest Road intersection at Little Forest to Canberra Crescent at Burrill Lake. The environmental impact statement (EIS) outlines a four-year construction program. No capital investment, construction jobs or operational jobs are stated.
The EIS is dated September 2026 and was exhibited. It drew 61 submissions: 13 objecting, 20 supporting and 28 commenting. The case is now at the response to submissions stage, where the proponent responds to the issues raised and may amend the project. Next, the department assesses the project with advice from other agencies, then writes an assessment report. A decision follows.
- Bypass length
- 12 kmPortal page
- Public submissions
- 61 submissionsPortal page
- Submissions objecting
- 13 submissionsPortal page
The department's description
Transport for NSW (Transport) is proposing to upgrade a section of the Princes Highway to create a 12 km bypass of the towns of Milton and Ulladulla.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
61 submissions: 52 from the public, 8 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
60 documents in 6 folders, each on the NSW Planning Portal
Application1
SEARs3
EIS47
- Appendix A SEARs checklist
- Appendix B EP&A Regulation 2021 checklist
- Appendix C Statutory compliance table
- Appendix D Community & stakeholder engagement
- Appendix E Mitigation measures
- Chapter 1 Introduction and background
- Chapter 10 Non-Aboriginal heritage
- Chapter 11 Urban Design landscape and visual
- Chapter 12 Noise and vibration
- Chapter 13 Land use and property
- Chapter 14 Agriculture
- Chapter 15 Social and economic
- Chapter 16 Flooding
- Chapter 17 Soils and contamination
- Chapter 18 Hydrology surface and groundwater
- Chapter 19 Air quality
- Chapter 2 Statutory context
- Chapter 20 Climate change risk
- Chapter 21 Sustainability
- Chapter 22 Waste
- Chapter 23 Cumulative impacts
- Chapter 24 Project justification and conclusion
- Chapter 25 References
- Chapter 26 Glossary of terms and abbreviations
- Chapter 3 Strategic context and project need
- Chapter 4 Selection of the preferred project
- Chapter 5 Project description
- Chapter 6 Community and stakeholder engagement
- Chapter 7 Biodiversity
- Chapter 8 Traffic and transport
- Chapter 9 Aboriginal cultural heritage
- EIS Summary
- Milton Ulladulla bypass EIS
- Technical Report 1 Biodiversity
- Technical Report 10 Flooding Assessment
- Technical Report 11 Hydro Surface and Groundwater
- Technical Report 12 Contamination (DSI)
- Technical Report 13 Air Quality
- Technical Report 2 Traffic and Transport
- Technical Report 3 Aboriginal Cultural Heritage
- Technical Report 4 Statement of Heritage Impact
- Technical Report 5 Urban Design LCVIA
- Technical Report 6 Noise and vibration
- Technical Report 7 Agricultural Impact Assessment
- Technical Report 8 Social Impact Assessment
- Technical Report 9 Economic and Business
- Technical report 14 Climate change risk
Exhibition1
Response to Submissions1
What's near it
Where it is
- Suburb
- Ulladulla
- Council area
- Shoalhaven
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.