Prestons Waste Treatment Facility

A waste treatment facility at Whyalla Place, Prestons

Decided: approved on 16 Apr 2026WasteLocal scale

Where it is in the process

Approved on 16 Apr 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination16 Apr 2026 (done)
  9. Approved16 Apr 2026

What it proposes

AI summary. Written from this project's page and its Assessment Report Prestons WTF and Instrument of Consent Prestons WTF on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A waste treatment facility at Whyalla Place, Prestons

The proponent sought consent to upgrade an existing industrial site at 9-13 Whyalla Place, Prestons, in Liverpool City Council's area, as a waste treatment facility. It would accept up to 210,500 tonnes a year of contaminated liquid wastes, solid wastes, soils and sludges, down from 270,000 tonnes in the original application. The building would grow by 1,300 m² to 6,400 m². The capital investment is $6,376,000, with 10 construction jobs and 39 operational jobs.

The environmental impact statement (EIS) was exhibited from 19 Nov 2021 to 16 Dec 2021. It drew 14 public submissions, 12 objecting and one commenting. The proponent responded in May 2023 and amended the project in September 2025. The department recommended approval, and its Acting Director approved it on 16 Apr 2026 as the Minister's delegate, with conditions. Next, the proponent must meet those conditions before and during operation.

Capital investment
$6.38MAssessment Report Prestons WTF
Annual waste capacity
210,500 tonnes a yearAssessment Report Prestons WTF
Original annual waste capacity
270,000 tonnes a yearAssessment Report Prestons WTF
Construction jobs
10 jobsAssessment Report Prestons WTF
Operational jobs
39 jobsAssessment Report Prestons WTF
Building floor area after extension
6,400 m²Assessment Report Prestons WTF
Site area
9,100 m²Assessment Report Prestons WTF
Public submissions
14 submissionsAssessment Report Prestons WTF

The department's description

Hi Quality Waste Treatment Services is seeking approval for the construction and operation of a Waste Treatment Facility with the capacity to accept and process/store up to 270,000 tonnes of soil, sediment, sludges and liquid waste and packaged waste

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

92 documents in 11 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs1
EIS7
Submissions1
Response to Submissions9
Agency Advice27
Amendments17
Additional Information20
Determination3
Management Plans and Strategies5

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.