State significant development

Precious Metals Refinery and Production Facility

A precious metals refinery at 49 Fitzroy Street, Marrickville

Under way: at prepare eisIndustry and warehousesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report_49 Fitzroy Street Marrickville on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A precious metals refinery at 49 Fitzroy Street, Marrickville

The proponent proposes to demolish an industrial building at 49 Fitzroy Street, Marrickville, in the Inner West Council area, and build a precious metals refinery and production facility. It would refine up to 400 tonnes a year of gold and 1,100 tonnes a year of silver, with 65 at-grade car parking spaces, a showroom and trade centre. The site is about 1.028 ha. No capital investment figure is stated, though the scoping report says the cost is above $30 million.

The proponent lodged a scoping report dated 25 Sep 2026 and the Secretary's environmental assessment requirements (SEARs) have been issued. The proponent is now preparing an environmental impact statement (EIS). Next, the EIS would be exhibited and the public could make submissions. No submissions have been made yet. The department would then assess the project.

Gold refining capacity
400 tonnes a yearScoping Report_49 Fitzroy Street Marrickville
Silver refining capacity
1,100 tonnes a yearScoping Report_49 Fitzroy Street Marrickville
Car parking spaces
65 car spacesScoping Report_49 Fitzroy Street Marrickville
Site area
1.03 haScoping Report_49 Fitzroy Street Marrickville

The department's description

Construction and operation of a precious metals refinery and production facility, including a showroom, trade centre, carparking and associated site works.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.