The Plains Wind Farm

A 188-turbine, 1,350 MW wind farm south of Hay

Under way: at assessmentEnergy: windRegional scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 188-turbine, 1,350 MW wind farm south of Hay

The proponent proposes The Plains Wind Farm, with up to 188 wind turbines and an estimated capacity of up to 1,350 MW, east and west of the Cobb Highway about 15 km south of Hay, in the Hay Shire. The development footprint is about 1,997 ha. It also includes local road upgrades, temporary construction facilities and electrical works to connect to the grid. The environmental impact statement (EIS) estimates about 700 jobs a year at peak construction over 40 months and 46 direct and indirect operational jobs. No capital investment is stated.

The EIS is dated 24 Apr 2024 and was exhibited, drawing 56 submissions: 38 objecting, 14 supporting and 4 commenting. The proponent responded and amended the project, and the department asked for more information on 19 Aug 2026. The case is at the more information required stage. Next, the department assesses the project and prepares a report and recommendation before it is decided.

Wind turbines
188 turbinesPortal page
Estimated capacity
1,350 MWEIS
Development footprint
1,997 haEIS
Peak construction jobs
700 jobsEIS
Operational jobs
46 jobsEIS

The department's description

Development of a wind farm with up to 188 wind turbines and associated infrastructure

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

56 submissions: 46 from the public, 7 from organisations and 3 from public authorities

Object38
Support14
Comment4

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

79 documents in 8 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs19
EIS19
Response to Submissions2
Agency Advice14
Amendments21
Additional Information2

What's near it

Where it is

Suburb
Maude
Council area
Hay

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.